Browse "IE-Journal Papers(저널논문)" by Author Lee, Tae-Eog

Showing results 23 to 74 of 74

23
Guest Editorial Special Section-Papers From the 2019 MASM/WSC Conference

Fowler, John W.; Monch, Lars; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.33, no.4, pp.493 - 495, 2020-11

24
Industry 3.5: IE developments and prospects in the Asia-pacific region Foreward

Chien, Chen-Fu; Halim, Abdul Hakim; He, Zhen; Thanh Phong Ho; Ishii, Kazuyoshi; Lee, Tae-Eog, COMPUTERS & INDUSTRIAL ENGINEERING, v.153, 2021-03

25
Integrated Scheduling of a Dual-Armed Cluster Tool for Maximizing Steady Schedule Patterns

Kim, Woojin; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SYSTEMS, MAN, AND CYBERNETICS: SYSTEMS, v.51, no.12, pp.7282 - 7294, 2021-12

26
K-Cyclic Schedules and the Worst-Case Wafer Delay in a Dual-Armed Cluster Tool

Roh, Dong-Hyun; Lee, Tae-Gyung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.32, no.2, pp.236 - 249, 2019-05

27
Machine capacity allocation strategies for scheduling a large multi-chip assembly line

Lee, Sang-Jin; Lee, Tae-Eog, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.5, pp.327 - 337, 2011

28
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05

29
MINIMIZING TOTAL TARDINESS ON PARALLEL MACHINES SUBJECT TO FLEXIBLE MAINTENANCE

Lee, Ju-Yong; Kim, Yeong-Dae; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.4, pp.472 - 489, 2018-12

30
Modeling and implementing a real-time scheduler for dual-armed cluster tools

Shin, YH; Lee, Tae-Eog; Kim, JH; Lee, HY, COMPUTERS IN INDUSTRY, v.45, no.1, pp.13 - 27, 2001-05

31
Modeling, Analysis, and Scheduling of Cluster Tools With Two Independent Arms

Tonke, Daniel; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1176 - 1188, 2016-04

32
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes

Chien, CF; Dauzere-Peres, S; Ehm, H; Fowler, JW; Jiang, ZB; Krishnaswamy, S; Lee, Tae-Eog; et al, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.5, no.3, pp.254 - 271, 2011

33
Modelling and Simulation of a River-Crossing Operation via Discrete Event Simulation with Engineering Details

Jung, Chungjo; Yun, Woo-Seop; Moon, Il-Chul; Lee, Tae-Eog, DEFENCE SCIENCE JOURNAL, v.65, no.2, pp.135 - 143, 2015-03

34
Modelling and simulation of automated manufacturing systems for evaluation of complex schedules

Kim, Chulhan; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3734 - 3747, 2013-06

35
Non-Cyclic Scheduling of a Wet Station

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.4, pp.1262 - 1274, 2014-10

36
Noncyclic Scheduling for Timed Discrete-Event Systems With Application to Single-Armed Cluster Tools Using Pareto-Optimal Optimization

Uno, Wikborg; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.3, pp.699 - 710, 2013-07

37
Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04

38
Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module

Kim, Dae-Kyu; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.55, no.11, pp.3092 - 3109, 2017-07

39
Optimal Scheduling of Transient Cycles for Single-Armed Cluster Tools With Parallel Chambers

Kim, Dae-Kyu; Lee, Tae-Eog; Kim, Hyunjung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1165 - 1175, 2016-04

40
Performance measures and schedules in periodic job shops

Lee, Tae-Eog; Posner, ME, OPERATIONS RESEARCH, v.45, no.1, pp.72 - 91, 1997

41
Petri net modeling and scheduling for cyclic job shops with blocking

Song, JS; Lee, Tae-Eog, COMPUTERS & INDUSTRIAL ENGINEERING, v.34, no.2, pp.281 - 295, 1998-04

42
Reachability Tree-Based Optimization Algorithm for Cyclic Scheduling of Timed Petri Nets

Kim, Chulhan; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.18, no.3, pp.1441 - 1452, 2021-07

43
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07

44
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net

Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07

45
Schedule Restoration for Single-Armed Cluster Tools

Kim, Ja-Hee; Zhou, MengChu; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.27, no.3, pp.388 - 399, 2014-08

46
Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots

Lee, Tae-Eog; Lee, HY; Lee, SJ, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.45, no.3, pp.487 - 507, 2007-02

47
Scheduling analysis of time-constrained dual-armed cluster tools

Kim, JH; Lee, Tae-Eog; Lee, HY; Park, DB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.16, no.3, pp.521 - 534, 2003-08

48
Scheduling and control of automated manufacturing systems

Gunther, HO; Lee, Tae-Eog, OR SPECTRUM, v.29, no.3, pp.373 - 374, 2007-07

49
Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.2, pp.525 - 536, 2014-04

50
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10

51
Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots

Kim, Hyun-Jung; Lee, Jun-Ho; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.1, pp.145 - 159, 2013-01

52
Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows

Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.3, pp.1058 - 1070, 2019-07

53
Scheduling Dual-Armed Cluster Tools with Chamber Cleaning Operations

Yu, Tae Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.1, pp.218 - 228, 2019-01

54
Scheduling dual-armed cluster tools with cleaning processes

Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06

55
Scheduling In-Line Multiple Cluster Tools

Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05

56
Scheduling Lot Switching Operations for Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11

57
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

58
Scheduling single-armed cluster tools with reentrant wafer flows

Lee, HY; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.19, no.2, pp.226 - 240, 2006-05

59
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation

Kim, Tae-Kyu; Jung, Chihyun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.50, no.10, pp.2785 - 2795, 2012

60
Search-based heuristic algorithms for basic planning in a large shipyard

Lee, Tae-Eog; Song J.S; Im J.C; Park JC; Jeong DS; Lee KR, JOURNAL OF SHIP PRODUCTION, v.12, no.4, pp.211 - 219, 1996-11

61
SECAM: A Supervisory Equipment Control Application Model for Integrated Semiconductor Manufacturing Equipment,

Lee, JH; Lee, Tae-Eog, IEEE ROBOTICS & AUTOMATION MAGAZINE, v.11, no.1, pp.41 - 58, 2004-03

62
Stable earliest starting schedules for cyclic job shops: A linear system approach

Lee, Tae-Eog, INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, v.12, no.1, pp.59 - 80, 2000-02

63
Steady state analysis of timed event graphs with time window constraints

Lee, Tae-Eog; Park, Seong-Ho; Jung, Chihyun, DISCRETE APPLIED MATHEMATICS, v.167, pp.202 - 216, 2014-04

64
Steady-state analysis and scheduling of cyclic job shops with overtaking

Seo, JW; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, v.14, no.4, pp.291 - 318, 2002-10

65
Stochastic cyclic flow lines with blocking: Markovian models

Lee, Young-Doo; Lee, Tae-Eog, OR SPECTRUM, v.27, no.4, pp.551 - 568, 2005-08

66
Stochastic cyclic flow lines: non-blocking, Markovian models

Lee, Tae-Eog; Seo, JW, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.49, no.5, pp.537 - 548, 1998-05

67
The asymptotic value-to-capacity ratio for the multi-class stochastic knapsack problem

Lee, Tae-Eog; Oh, GT, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.103, no.3, pp.584 - 594, 1997

68
The complexity of cyclic shop scheduling problems

Hall, NG; Lee, Tae-Eog; Posner, ME, JOURNAL OF SCHEDULING, v.5, no.4, pp.307 - 327, 2002

69
Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.3, pp.1007 - 1016, 2015-07

70
Token Delays and Generalized Workload Balancing for Timed Event Graphs with Application to Cluster Tool

Lee, Tae-Eog; Lee, Hwan-Yong; Sreenivas, Ramavarapu S., Proceeding of the 2006 IEEE Cinference on Automation Science and Engineering, pp.93-99, 2006

71
Toward Robust Battle Experimental Design for Command and Control of Mechanized Infantry Brigade

Yun, Woo-Seop; Ko, Sunggil; Byun, Muhyun; Kim, Heeyoung; Moon, II-Chul; Lee, Tae-Eog, MILITARY OPERATIONS RESEARCH, v.27, no.1, pp.45 - 72, 2022-05

72
Virtual control - A virtual cluster tool for testing and verifying a cluster tool controller and a scheduler

Joo, YJ; Lee, Tae-Eog, IEEE ROBOTICS & AUTOMATION MAGAZINE, v.11, no.3, pp.33 - 49, 2004-09

73
Wafer delay analysis and control of dual-armed cluster tools with chamber cleaning operations

Yu, Tae-Sun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.58, no.2, pp.434 - 447, 2020-01

74
Wafer Delay Analysis and Workload Balancing of Parallel Chambers for Dual-Armed Cluster Tools With Multiple Wafer Types

Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.18, no.3, pp.1516 - 1526, 2021-07

Discover

Type

Open Access

Date issued

. next

Subject

. next

rss_1.0 rss_2.0 atom_1.0