Browse "IE-Journal Papers(저널논문)" by Author Lee, Tae-Eog

Showing results 1 to 60 of 74

1
A Branch and Bound Algorithm for Cyclic Scheduling of Timed Petri Nets

Jung, Chihyun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.1, pp.309 - 323, 2015-01

2
A Branch-and-price algorithm for placement routing for a multi-head beam-type component placement tool

Sun, DS; Lee, Tae-Eog, OR SPECTRUM, v.30, no.3, pp.515 - 534, 2008-06

3
A column generation approach for pickup cycle formation in multi-head gantry-type compoennt placement tools

Sun, DS; Lee, Tae-Eog; Lee, K, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.10, no.4, pp.569 - 576, 2003-12

4
A multiresolution simulation system and simulation development processes

Jee, Young-Jun; Lee, Tae-Gyung; Park, Sang-Ho; Cho, Jun-Ho; Kim, Hee-Soo; Lee, Tae-Eog, JOURNAL OF DEFENSE MODELING AND SIMULATION-APPLICATIONS METHODOLOGY TECHNOLOGY-JDMS, v.19, no.3, pp.325 - 338, 2022-07

5
A New Class of Sequences Without Interferences for Cluster Tools With Tight Wafer Delay Constraints

Lim, Yuchul; Yu, Tae Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.1, pp.392 - 405, 2019-01

6
A tabu search procedure for periodic job shop scheduling

Song, JS; Lee, Tae-Eog, COMPUTERS INDUSTRIAL ENGINEERING, v.30, no.3, pp.433 - 447, 1996-07

7
A three-level supply chain network design model with risk-pooling and lead times

Park, Sukun; Lee, Tae-Eog; Sung, Chang Sup, TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, v.46, no.5, pp.563 - 581, 2010-09

8
A two-phase approach for design of supervisory controllers for robot cells: Model checking and Markov decision models

Lee, Tae-Eog; Lee, JH, ANNALS OF OPERATIONS RESEARCH, v.77, pp.157 - 182, 1998-02

9
Achieving new insights into combat engagement analysis via simulation-based sequential experimentation

Kim, Junghoon; Seo, Kyung Min; Lee, Tae-Eog; Choi, Bong Wan, MILITARY OPERATIONS RESEARCH, v.23, no.4, pp.51 - 80, 2018

10
Adaptive Scheduling of Cluster Tools With Wafer Delay Constraints and Process Time Variation

Lim, Yuchul; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.17, no.1, pp.375 - 388, 2020-01

11
An Efficient Mixed Integer Programming Model Based on Timed Petri Nets for Diverse Complex Cluster Tool Scheduling Problems

Jung, Chihyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.2, pp.186 - 199, 2012-05

12
An extended event graph with negative places and tokens for time window constraints

Lee, Tae-Eog; Park, SH, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.2, no.4, pp.319 - 332, 2005-10

13
An extended maximum entropy method for estimation of rare event probabilities

Lee, Tae-Eog; Lee, YD, EUROPEAN TRANSACTIONS ON TELECOMMUNICATIONS, v.13, no.4, pp.399 - 407, 2002

14
Automata-based supervisory control logic design for a multi-robot assembly cell

Lee, JK; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.15, no.4, pp.319 - 334, 2002

15
Characterizing Token Delays of Timed Event Graphs for K-Cyclic Schedules

Lee, Tae-Eog; Kim, Hyunjung; Roh, Dong-Hyun; Sreenivas, Ramavarapu S., IEEE TRANSACTIONS ON AUTOMATIC CONTROL, v.62, no.2, pp.961 - 966, 2017-02

16
Cleaning Plan Optimization for Dual-Armed Cluster Tools With General Chamber Cleaning Periods

Lee, Tae-Gyung; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.20, no.3, pp.1890 - 1906, 2023-07

17
Cluster tool module communication based on a high-level fieldbus

Lee, JH; Lee, Tae-Eog; Park, JH, INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.17, no.2, pp.151 - 170, 2004-03

18
Component allocation and feeder arrangement for a dual-gantry multi-head surface mounting placement tool

Sun, DS; Lee, Tae-Eog; Kim, KH, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.95, no.2, pp.245 - 264, 2005-02

19
Cyclic Scheduling of Cluster Tools With Nonidentical Chamber Access Times Between Parallel Chambers

Kim, Dae-Kyu; Jung, Yu-Ju; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.3, pp.420 - 431, 2012-08

20
Event graph modelling of automated sorting and buffering system

Choi, BK; Park, JH; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.9, no.5, pp.369 - 380, 1996

21
Feedback Control of Cluster Tools for Regulating Wafer Delays

Kim, Chulhan; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1189 - 1199, 2016-04

22
Feedback Control of Cluster Tools: Stability Against Random Time Disruptions

Kim, Chulhan; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.3, pp.2008 - 2015, 2022-07

23
Guest Editorial Special Section-Papers From the 2019 MASM/WSC Conference

Fowler, John W.; Monch, Lars; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.33, no.4, pp.493 - 495, 2020-11

24
Industry 3.5: IE developments and prospects in the Asia-pacific region Foreward

Chien, Chen-Fu; Halim, Abdul Hakim; He, Zhen; Thanh Phong Ho; Ishii, Kazuyoshi; Lee, Tae-Eog, COMPUTERS & INDUSTRIAL ENGINEERING, v.153, 2021-03

25
Integrated Scheduling of a Dual-Armed Cluster Tool for Maximizing Steady Schedule Patterns

Kim, Woojin; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SYSTEMS, MAN, AND CYBERNETICS: SYSTEMS, v.51, no.12, pp.7282 - 7294, 2021-12

26
K-Cyclic Schedules and the Worst-Case Wafer Delay in a Dual-Armed Cluster Tool

Roh, Dong-Hyun; Lee, Tae-Gyung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.32, no.2, pp.236 - 249, 2019-05

27
Machine capacity allocation strategies for scheduling a large multi-chip assembly line

Lee, Sang-Jin; Lee, Tae-Eog, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.5, pp.327 - 337, 2011

28
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05

29
MINIMIZING TOTAL TARDINESS ON PARALLEL MACHINES SUBJECT TO FLEXIBLE MAINTENANCE

Lee, Ju-Yong; Kim, Yeong-Dae; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.4, pp.472 - 489, 2018-12

30
Modeling and implementing a real-time scheduler for dual-armed cluster tools

Shin, YH; Lee, Tae-Eog; Kim, JH; Lee, HY, COMPUTERS IN INDUSTRY, v.45, no.1, pp.13 - 27, 2001-05

31
Modeling, Analysis, and Scheduling of Cluster Tools With Two Independent Arms

Tonke, Daniel; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1176 - 1188, 2016-04

32
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes

Chien, CF; Dauzere-Peres, S; Ehm, H; Fowler, JW; Jiang, ZB; Krishnaswamy, S; Lee, Tae-Eog; et al, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.5, no.3, pp.254 - 271, 2011

33
Modelling and Simulation of a River-Crossing Operation via Discrete Event Simulation with Engineering Details

Jung, Chungjo; Yun, Woo-Seop; Moon, Il-Chul; Lee, Tae-Eog, DEFENCE SCIENCE JOURNAL, v.65, no.2, pp.135 - 143, 2015-03

34
Modelling and simulation of automated manufacturing systems for evaluation of complex schedules

Kim, Chulhan; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3734 - 3747, 2013-06

35
Non-Cyclic Scheduling of a Wet Station

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.4, pp.1262 - 1274, 2014-10

36
Noncyclic Scheduling for Timed Discrete-Event Systems With Application to Single-Armed Cluster Tools Using Pareto-Optimal Optimization

Uno, Wikborg; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.3, pp.699 - 710, 2013-07

37
Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04

38
Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module

Kim, Dae-Kyu; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.55, no.11, pp.3092 - 3109, 2017-07

39
Optimal Scheduling of Transient Cycles for Single-Armed Cluster Tools With Parallel Chambers

Kim, Dae-Kyu; Lee, Tae-Eog; Kim, Hyunjung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1165 - 1175, 2016-04

40
Performance measures and schedules in periodic job shops

Lee, Tae-Eog; Posner, ME, OPERATIONS RESEARCH, v.45, no.1, pp.72 - 91, 1997

41
Petri net modeling and scheduling for cyclic job shops with blocking

Song, JS; Lee, Tae-Eog, COMPUTERS & INDUSTRIAL ENGINEERING, v.34, no.2, pp.281 - 295, 1998-04

42
Reachability Tree-Based Optimization Algorithm for Cyclic Scheduling of Timed Petri Nets

Kim, Chulhan; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.18, no.3, pp.1441 - 1452, 2021-07

43
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07

44
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net

Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07

45
Schedule Restoration for Single-Armed Cluster Tools

Kim, Ja-Hee; Zhou, MengChu; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.27, no.3, pp.388 - 399, 2014-08

46
Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots

Lee, Tae-Eog; Lee, HY; Lee, SJ, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.45, no.3, pp.487 - 507, 2007-02

47
Scheduling analysis of time-constrained dual-armed cluster tools

Kim, JH; Lee, Tae-Eog; Lee, HY; Park, DB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.16, no.3, pp.521 - 534, 2003-08

48
Scheduling and control of automated manufacturing systems

Gunther, HO; Lee, Tae-Eog, OR SPECTRUM, v.29, no.3, pp.373 - 374, 2007-07

49
Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.2, pp.525 - 536, 2014-04

50
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10

51
Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots

Kim, Hyun-Jung; Lee, Jun-Ho; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.1, pp.145 - 159, 2013-01

52
Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows

Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.3, pp.1058 - 1070, 2019-07

53
Scheduling Dual-Armed Cluster Tools with Chamber Cleaning Operations

Yu, Tae Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.1, pp.218 - 228, 2019-01

54
Scheduling dual-armed cluster tools with cleaning processes

Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06

55
Scheduling In-Line Multiple Cluster Tools

Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05

56
Scheduling Lot Switching Operations for Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11

57
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

58
Scheduling single-armed cluster tools with reentrant wafer flows

Lee, HY; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.19, no.2, pp.226 - 240, 2006-05

59
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation

Kim, Tae-Kyu; Jung, Chihyun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.50, no.10, pp.2785 - 2795, 2012

60
Search-based heuristic algorithms for basic planning in a large shipyard

Lee, Tae-Eog; Song J.S; Im J.C; Park JC; Jeong DS; Lee KR, JOURNAL OF SHIP PRODUCTION, v.12, no.4, pp.211 - 219, 1996-11

Discover

Type

Open Access

Date issued

. next

Subject

. next

rss_1.0 rss_2.0 atom_1.0