Showing results 79 to 138 of 173
Loosely coupled memory-based decoding architecture for low density parity check codes Kang, SH; Park, In-Cheol, IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS I-REGULAR PAPERS, v.53, no.5, pp.1045 - 1056, 2006-05 |
Max Contribution: An Online Approximation of Optimal Resource Allocation in Delay Tolerant Networks Lee, Kyunghan; Jeong, Jaeseong; Yi, Yung; Won, Hyungsuk; Rhee, Injong; Chong, Song, IEEE TRANSACTIONS ON MOBILE COMPUTING, v.14, no.3, pp.592 - 605, 2015-03 |
Maximizing total job value on a single machine with job selection Eun, Joonyup; Sung, Chang Sup; Kim, Eun-Seok, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.68, no.9, pp.998 - 1005, 2017-09 |
Memory power-aware virtual machine scheduling = 메모리 전력 소모를 고려한 가상 기계 스케줄링 방법link Jang, Jae-Wan; 장재완; et al, 한국과학기술원, 2010 |
Minimizing Due Date Related Peformance Measures on Two Batch Processing Machines Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.147, no.3, pp.644 - 656, 2003-06 |
Minimizing makespan in a two-machine flowshop scheduling problem with delay time constraints = 두 단계 흐름 공정에서의 지연시간을 고려한 스케줄링에 관한 연구link Son, Jung-Dae; 손정대; et al, 한국과학기술원, 2006 |
Minimizing Makespan on a Single Burn-in Oven in Semiconductor Manufacturing Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.120, no.3, pp.559 - 574, 2000-02 |
Minimizing makespan on a two-machine re-entrant flowshop Choi, SW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.972 - 981, 2007-07 |
Minimizing makespan on an m-machine re-entrant flowshop Choi, Seong-Woo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.5, pp.1684 - 1696, 2008-05 |
Minimizing total tardiness in an unrelated parallel-machine scheduling problem Shim, SO; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.346 - 354, 2007-03 |
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop Choi, SW; Kim, Yeong-Dae; Lee, GC, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.43, pp.2149 - 2167, 2005-06 |
MINIMIZING TOTAL TARDINESS ON PARALLEL MACHINES SUBJECT TO FLEXIBLE MAINTENANCE Lee, Ju-Yong; Kim, Yeong-Dae; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.4, pp.472 - 489, 2018-12 |
Minimizing total tardiness on parallel machines with job splitting property = 작업 분할이 있는 병렬 기계에서의 납기를 고려한 스케줄링 문제에 관한 연구link Kim, Soo-Bin; 김수빈; et al, 한국과학기술원, 2002 |
Minimizing Total Weighted Completion Time at a Pre-assembly Stage Composed of Tow Feeding Machines Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.54, no.3, pp.247 - 255, 1998-04 |
MN-MATE: Elastic Resource Management of Manycores and a Hybrid Memory Hierarchy for a Cloud Node Park, Kyu Ho; Hwang, Woomin; Seok, Hyunchul; Kim, Chulmin; Shin, Dong-Jae; Kim, Dong Jin; Maeng, Min Kyu; et al, ACM JOURNAL ON EMERGING TECHNOLOGIES IN COMPUTING SYSTEMS, v.12, no.1, 2015-07 |
Modeling and implementing a real-time scheduler for dual-armed cluster tools Shin, YH; Lee, Tae-Eog; Kim, JH; Lee, HY, COMPUTERS IN INDUSTRY, v.45, no.1, pp.13 - 27, 2001-05 |
Modeling and scheduling of cyclic shops with overtaking and time window constraints = 추월작업과 시간제약이 있는 혼류 반복작업장의 모델링 및 스케줄링link Seo, Jeong-Won; 서정원; et al, 한국과학기술원, 2001 |
Modelling and simulation of automated manufacturing systems for evaluation of complex schedules Kim, Chulhan; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3734 - 3747, 2013-06 |
Multiproduct Lot Merging-Splitting Algorithms for Semiconductor Wafer Fabrication Bang, June-Young; Kim, Yeong-Dae; Choi, Seong-Woo, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.2, pp.200 - 210, 2012-05 |
New linear program performance bounds for closed queueing networks Morrison, James R; Kumar, PR, DISCRETE EVENT DYNAMIC SYSTEMS-THEORY AND APPLICATIONS, v.11, no.4, pp.291 - 317, 2001-10 |
New linear program performance bounds for queueing networks Morrison, James R; Kumar, PR, JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, v.100, no.3, pp.575 - 597, 1999-03 |
Non-clairvoyant scheduling for weight flow time Chwa, Kyung Yong, INFORMATION PROCESSING LETTERS, v.87, no.1, pp.31 - 37, 2003-07 |
Non-preemptible last section assignment for reducing feedback latency in real-time control systems Song, Chi Young; Kim, Byung Kook, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.40, no.5, pp.479 - 495, 2009 |
Noncyclic Scheduling for Timed Discrete-Event Systems With Application to Single-Armed Cluster Tools Using Pareto-Optimal Optimization Uno, Wikborg; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.3, pp.699 - 710, 2013-07 |
On the robustness of scheduling against channel variations Chung, Sae-Young; Humblet, Pierre A., IEEE TRANSACTIONS ON WIRELESS COMMUNICATIONS, v.6, no.9, pp.3186 - 3190, 2007-09 |
On-demand utility-based power control routing for energy-aware optimization in mobile ad hoc networks Min, Chan-Ho; Kim, Sehun, JOURNAL OF NETWORK AND COMPUTER APPLICATIONS, v.30, no.2, pp.706 - 727, 2007-04 |
Online deadline scheduling on faster machines Chwa, Kyung Yong, INFORMATION PROCESSING LETTERS, v.85, no.1, pp.31 - 37, 2003-01 |
Operation optimization and decoking scheduling of industrial naphtha cracking furnaces using a simplified furnace model = 단순화된 모델을 이용한 산업용 납사 분해로의 조업 조건 최적화와 디코킹 일정 결정link Lim, Hee-Jin; 임희진; et al, 한국과학기술원, 2005 |
Optimal scheduling of dual-armed cluster tools with complex scheduling requirements by general robot task sequences = 일반적인 로봇 작업 순서를 고려한 복잡한 스케줄링 요구사항을 갖는 양팔 클러스터 장비의 최적 스케줄링에 관한 연구link Paek, Jin-Heum; 백진흠; et al, 한국과학기술원, 2008 |
Overrun Methods and Resource Holding Times for Hierarchical Scheduling of Semi-Independent Real-Time Systems Behnam, M; Nolte, T; Sjodin, M; Shin, Insik, IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, v.6, pp.93 - 104, 2010-02 |
Petri net modeling and scheduling for cyclic job shops with blocking Song, JS; Lee, Tae-Eog, COMPUTERS & INDUSTRIAL ENGINEERING, v.34, no.2, pp.281 - 295, 1998-04 |
Port partitioning and dynamic queueing for IP forwarding Lee, Chae Young; Cho, HK, COMPUTERS OPERATIONS RESEARCH, v.29, no.9, pp.1157 - 1172, 2002-08 |
Power saving scheduling for multiple target coverage in wireless sensor network = 무선 센서 네트워크에서 다중 목표물을 지원하는 전력 절감 스케줄링 방안link Pyun, Sung-Yeop; 편성엽; et al, 한국과학기술원, 2008 |
Prediction-Based Micro-Scheduler: Toward Responsive Scheduling of General-Purpose Operating Systems Lee, Jupyung; Park, Kyu Ho, IEEE TRANSACTIONS ON COMPUTERS, v.58, no.5, pp.648 - 661, 2009-05 |
Queuing Analysis in a Multiuser Diversity System With Adaptive Modulation and Coding Scheme Kim, Tae-Joon; Lim, Jong-Tae, IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, v.60, no.1, pp.338 - 342, 2011-01 |
RANDOMIZED SCHEDULING ALGORITHM FOR QUEUEING NETWORKS Shah, Devavrat; Shin, Jinwoo, ANNALS OF APPLIED PROBABILITY, v.22, no.1, pp.128 - 171, 2012-02 |
Real-time scheduling of control tasks for improving control performance = 제어 성능 향상을 위한 제어 태스크의 실시간 스케쥴링에 관한 연구link Song, Chi-Young; 송치영; et al, 한국과학기술원, 2006 |
Receiver set partitioning and sequencing for multicasting traffic in a WDM lightwave single-hop network Sung, Chang Sup; Rim, HC, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.55, no.6, pp.630 - 639, 2004-06 |
Reinforcement learning for robotic flow shop scheduling with processing time variations Lee, Jun-Ho; Kim, Hyun-Jung, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.60, no.7, pp.2346 - 2368, 2022-04 |
Robust single machine scheduling with uncertain processing times = 불확실한 공정시간을 갖는 단일 기계 스케줄링 문제에서의 강건 스케줄link Lim, Jae Yoong; 임재용; et al, 한국과학기술원, 2016 |
Safety Verification and Control for Collision Avoidance at Road Intersections Ahn, Heejin; Del Vecchio, Domitilla, IEEE TRANSACTIONS ON AUTOMATIC CONTROL, v.63, no.3, pp.630 - 642, 2018-03 |
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07 |
Schedule Restoration for Single-Armed Cluster Tools Kim, Ja-Hee; Zhou, MengChu; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.27, no.3, pp.388 - 399, 2014-08 |
Scheduling a Reentrant Flexible Flow Line for Multi-Chip Package Assembly = 멀티칩 패키지 조립을 위한 재방문 흐름 공정의 일정계획 방법에 관한 연구link Lee, Sang-Jin; 이상진; et al, 한국과학기술원, 2008 |
Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots Lee, Tae-Eog; Lee, HY; Lee, SJ, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.45, no.3, pp.487 - 507, 2007-02 |
Scheduling Algorithms for Minimizing Tardiness of Orders at the Burn-in Workstation in a Semiconductor Manufacturing System Kim, Yeong-Dae; Kang, Jae-Hun; Lee, Gyeong-Eun; Lim, Seung-Kil, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.24, no.1, pp.14 - 26, 2011-02 |
Scheduling analysis of time-constrained dual-armed cluster tools Kim, JH; Lee, Tae-Eog; Lee, HY; Park, DB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.16, no.3, pp.521 - 534, 2003-08 |
Scheduling and control of extended event graphs with negative places and tokens for time constrained discrete event systems = 시간제약이 있는 이산 사건 시스템 모델링을 위해 네거티브 플레이스와 네거티브 토큰을 사용한 확장된 이벤트 그래프의 스케줄링과 제어link Park, Seong-Ho; 박성호; et al, 한국과학기술원, 2005 |
Scheduling cluster tools for concurrent processing of multiple wafer types = 복수 웨이퍼 혼류생산을 위한 클러스터 장비 스케줄링link Lee, Jun-Ho; 이준호; et al, 한국과학기술원, 2013 |
Scheduling cluster tools in wafer fabrication using candidate list and simulated annealing Yim, SJ; Lee, Doo Yong, JOURNAL OF INTELLIGENT MANUFACTURING, v.10, no.6, pp.531 - 540, 1999-06 |
Scheduling driven circuit partitioning algorithm for multiple FPGAs using time-multiplexed, off-chip, multi-casting interconnection architecture Kwon, YS; Kyung, Chong-Min, MICROPROCESSORS AND MICROSYSTEMS, v.28, pp.341 - 350, 2004-08 |
Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.3, pp.1058 - 1070, 2019-07 |
Scheduling dual-armed cluster tools with cleaning processes Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06 |
Scheduling for an arc-welding robot considering heat-caused distortion Kim, HJ; Kim, Yeong-Dae; Lee, DH, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.56, pp.39 - 50, 2005-01 |
Scheduling healthcare services in a home healthcare system An, Y-J; Kim, Yeong-Dae; Jeong, B. J.; Kim, S-D, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.63, no.11, pp.1589 - 1599, 2012-11 |
Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05 |
Scheduling in Heterogeneous Computing Environments for Proximity Queries Kim, Duk-Su; Lee, Jin-Kyu; Lee, Jung-Hwan; Shin, In-Sik; Kim, John Dongjun; Yoon, Sung-Eui, IEEE TRANSACTIONS ON VISUALIZATION AND COMPUTER GRAPHICS, v.19, no.9, pp.1513 - 1525, 2013-09 |
Scheduling In-Line Multiple Cluster Tools Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05 |
Scheduling Lot Switching Operations for Cluster Tools Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11 |
Scheduling of cluster tools with independent dual-arm under wafer delay constraints = 체재시간 제약을 가지는 독립된 두 팔 클러스터 장비의 스케줄링link Kwon, Yongmin; Lee, Tae-Eog; et al, 한국과학기술원, 2017 |
Discover