Results 1-6 of 6 (Search time: 0.003 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Modelling and Simulation of a River-Crossing Operation via Discrete Event Simulation with Engineering Details Jung, Chungjo; Yun, Woo-Seop; Moon, Il-Chul; Lee, Tae-Eog, DEFENCE SCIENCE JOURNAL, v.65, no.2, pp.135 - 143, 2015-03 | |
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10 | |
Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.3, pp.1007 - 1016, 2015-07 | |
Scheduling In-Line Multiple Cluster Tools Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05 | |
A Branch and Bound Algorithm for Cyclic Scheduling of Timed Petri Nets Jung, Chihyun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.1, pp.309 - 323, 2015-01 | |
Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04 |
Discover