Results 1-9 of 9 (Search time: 0.004 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
A space partitioning method for facility layout problems with shape constraints Kim, JG; Kim, Yeong-Dae, IIE TRANSACTIONS, v.30, no.10, pp.947 - 957, 1998-10 | |
Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility Kim, Yeong-Dae; Kim, JU; Lim, SK; Jun, HB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.11, no.1, pp.155 - 164, 1998-02 | |
Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems Lee, DH; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.10, pp.2653 - 2668, 1998-10 | |
A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules Jeong, KC; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.9, pp.2609 - 2626, 1998-09 | |
A systematic procedure for setting parameters in simulated annealing algorithms Park, MW; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.25, no.3, pp.207 - 217, 1998-03 | |
Performance analysis of assembly/disassembly systems with unreliable machines and random processing times Jeong, KC; Kim, Yeong-Dae, IIE TRANSACTIONS, v.30, no.1, pp.41 - 53, 1998-01 | |
Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions Lim, SK; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.104, no.1, pp.175 - 186, 1998-01 | |
A multi-period order selection problem in flexible manufacturing systems Lee, DH; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.49, no.3, pp.278 - 286, 1998-03 | |
A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities Kim, Yeong-Dae; Lee, DH; Kim, JU; Roh, HK, JOURNAL OF MANUFACTURING SYSTEMS, v.17, no.2, pp.107 - 117, 1998 |
Discover