A multi-period order selection problem in flexible manufacturing systems

Cited 10 time in webofscience Cited 0 time in scopus
  • Hit : 742
  • Download : 993
We consider a multi-period order selection problem in flexible manufacturing systems, which is the problem of selecting orders to be produced in each period during the upcoming planning horizon with the objective of minimising earliness and tardiness costs and subcontracting costs. The earliness and tardiness costs are incurred if an order is not finished on time, while subcontracting cost is incurred if an order is not selected within the planning horizon (and must be subcontracted) due to processing time capacity or tool magazine capacity. This problem is formulated as a 0-1 integer program which can be transformed into a generalised assignment problem. To solve the problem, a heuristic algorithm is developed using a Lagrangian relaxation technique. Effectiveness of the algorithm is tested on randomly generated problems and results are reported.
Publisher
STOCKTON PRESS
Issue Date
1998-03
Language
English
Article Type
Article
Keywords

PART TYPE SELECTION; ASSIGNMENT

Citation

JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.49, no.3, pp.278 - 286

ISSN
0160-5682
URI
http://hdl.handle.net/10203/7533
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 10 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0