Results 1-3 of 3 (Search time: 0.004 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07 | |
Scheduling analysis of time-constrained dual-armed cluster tools Kim, JH; Lee, Tae-Eog; Lee, HY; Park, DB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.16, no.3, pp.521 - 534, 2003-08 | |
Modeling and implementing a real-time scheduler for dual-armed cluster tools Shin, YH; Lee, Tae-Eog; Kim, JH; Lee, HY, COMPUTERS IN INDUSTRY, v.45, no.1, pp.13 - 27, 2001-05 |
Discover