Showing results 1 to 22 of 22
A decomposition approach to a multi-period vehicle scheduling problem Kim, JU; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.27, no.4, pp.421 - 430, 1999-08 |
A heuristic algorithm for a production planning problem in an assembly system Park, MW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.2, pp.138 - 147, 1999-02 |
A Lagrangian relaxation approach to multi-period inventory/distribution planning Kim, JU; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.51, no.3, pp.364 - 370, 2000-03 |
A simulated annealing algorithm for resource constrained project scheduling problems Cho, JH; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.48, no.7, pp.736 - 744, 1997-07 |
Algorithms for a class of single-machine weighted tardiness and earliness problems Yano, C.A.; Kim, Yeong-Dae, European Journal of Operational Research, v.52, no.2, pp.167 - 178, 1991-05 |
Algorithms for adjusting shapes of departments in block layouts on the grid-based plane Lee, GC; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.28, no.1, pp.111 - 122, 2000-02 |
Heuristics for search sequencing under time-dependent probabilities of existence Lee, Ho-Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.34, no.7, pp.2010 - 2024, 2007-07 |
Heuristics for selecting machines and determining buffer capacities in assembly systems Jeong, KC; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.38, no.3, pp.341 - 360, 2000-10 |
Iterative job splitting algorithms for parallel machine scheduling with job splitting and setup resource constraints Lee, Jun-Ho; Jang, Hoon; Kim, Hyun-Jung, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.72, no.4, pp.780 - 799, 2021-03 |
Joint configuration of backbone and logical networks on a reconfigurable packet-switched network with unreliable links Lee, JH; Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.30, no.3, pp.309 - 331, 1998-04 |
Linear programming and Lagrangian relaxation heuristics for designing a material flow network on a block layout Lee, Mi Lim; Kim, Jae-Gon; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.47, no.18, pp.5185 - 5202, 2009 |
Minimizing makespan on a two-machine re-entrant flowshop Choi, SW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.972 - 981, 2007-07 |
Minimizing makespan on an m-machine re-entrant flowshop Choi, Seong-Woo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.5, pp.1684 - 1696, 2008-05 |
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop Choi, SW; Kim, Yeong-Dae; Lee, GC, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.43, pp.2149 - 2167, 2005-06 |
Minimizing Total Weighted Completion Time at a Pre-assembly Stage Composed of Tow Feeding Machines Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.54, no.3, pp.247 - 255, 1998-04 |
Scheduling Algorithms for Minimizing Tardiness of Orders at the Burn-in Workstation in a Semiconductor Manufacturing System Kim, Yeong-Dae; Kang, Jae-Hun; Lee, Gyeong-Eun; Lim, Seung-Kil, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.24, no.1, pp.14 - 26, 2011-02 |
Scheduling for an arc-welding robot considering heat-caused distortion Kim, HJ; Kim, Yeong-Dae; Lee, DH, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.56, pp.39 - 50, 2005-01 |
Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication Facility Kim, Yeong-Dae; Joo, BJ; Choi, SY, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.23, pp.246 - 254, 2010-05 |
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process Kim, Yeong-Dae; Lim, HG; Park, MW, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.91, no.1, pp.124 - 143, 1996-05 |
Search heuristics for resource constrained project scheduling Lee, Jae-Kwan; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.47, no.5, pp.678 - 689, 1996-05 |
Stowage planning in maritime container transportation Kang, J.G.; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.53, no.4, pp.415 - 426, 2002-04 |
Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems Kim, Yeong-Dae; Lee, DH; Yoon, CM, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.133, no.3, pp.624 - 634, 2001-09 |
Discover