Results 1-8 of 8 (Search time: 0.006 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Scheduling in-line multiple cluster tools: A decomposition approach Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho; Kim, Chulhan; Baik, Sun-Hee, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08 | |
Scheduling transient periods of dual-armed cluster tools Lee, Tae-Eog; Lee, Jun-Ho; Kim, Hyun-Jung, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08 | |
Optimal scheduling of transient cycles for single-armed cluster tools Kim, Dae-Kyu; Lee, Tae-Eog; Kim, Hyun-Jung, IEEE International Conference on Automation Science and Engineering, pp.874 - 879, IEEE, 2013-08-17 | |
TWO-STAGE LOT SCHEDULING WITH WAITING TIME CONSTRAINTS AND DUE DATES Yu, Tae-Sun; Kim, Hyun-Jung; Jung, Chanwhi; Lee, Tae-Eog, Winter Simulation Conference on Simulation - Making Decisions in a Complex World, pp.3630 - 3641, IEEE, 2013-12-09 | |
Scheduling a wet station using a branch and bound algorithm Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho, IEEE Conference on Systems, Man, and Cybernetics, IEEE, 2012-10-16 | |
A Petri net-based modeling and scheduling with a branch and bound algorithm Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho, IEEE Conference on Systems, Man, and Cybernetics, IEEE, 2012-10-16 | |
Scheduling timed Petri nets with a time-feasible reachability tree Kim, Hyun-Jung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE Conference on Networking, Sensing, and Control, pp.94 - 99, IEEE Systems, Man, and Cybernetics Society, 2013-04-10 | |
Scheduling of cluster tools with ready time constraints for small lot production Lee, Tae-Eog; Kim, Hyun-Jung, IEEE 2011 International Conference on Automation Science and Engineering, pp.96 - 101, IEEE, 2011-08-25 |