Results 1-5 of 5 (Search time: 0.004 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Optimal scheduling of dual-armed cluster tools without swap restriction Paek, J.-H.; Lee, Tae-Eog, 4th IEEE Conference on Automation Science and Engineering, CASE 2008, pp.103 - 108, 2008-08-23 | |
An Efficient Scheduling Method Based on an Assignment Model for Robotized Cluster Tools Jung, Chihyun; Lee, Tae-Eog, IEEE 2008 International Conference on Automation Science and Engineering, pp.79 - 84, 2008-08-25 | |
Scheduling a multi-chip package assembly line with reentrant processes and unrelated parallel machines Lee, S.-J.; Lee, Tae-Eog, 2008 Winter Simulation Conference, WSC 2008, pp.2286 - 2291, WSC '08, 2008-12-07 | |
Efficient scheduling method based on an assignment model for robotized cluster tools Jung, Chihyun; Lee, Tae-Eog, 4th IEEE Conference on Automation Science and Engineering, CASE 2008, pp.79 - 84, 123, 2008-08-23 | |
A review of scheduling theory and methods for semiconductor manufacturing cluster tools Lee, Tae-Eog, 2008 Winter Simulation Conference, WSC 2008, pp.2127 - 2135, 123, 2008-12-07 |
Discover