Scheduling a multi-chip package assembly line with reentrant processes and unrelated parallel machines

Cited 6 time in webofscience Cited 0 time in scopus
  • Hit : 357
  • Download : 0
A multi-chip package(MCP) consists of several chip modules in a single package. We consider a scheduling problem for assembling MCPs. In order to assemble an MCP, a lot should repeat assembly process stages such as die attach and wire bonding as many as the number of chips to be assembled. The two key process stages have many parallel machines of various types. A machine processes different types of MCP lots with significant setup times. We therefore should limit the number of setups significantly while not sacrificing the on-time delivery performance much. We propose scheduling strategies of appropriately allocating the machine capacity to products and lots depending on the production progress of products and lots. We report experimental performances of the proposed methods.
Publisher
WSC '08
Issue Date
2008-12-07
Language
English
Citation

2008 Winter Simulation Conference, WSC 2008, pp.2286 - 2291

ISSN
0891-7736
DOI
10.1109/WSC.2008.4736332
URI
http://hdl.handle.net/10203/154916
Appears in Collection
IE-Conference Papers(학술회의논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 6 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0