Makespan Analysis of Lot Switching Period in Cluster Tools

Cited 32 time in webofscience Cited 26 time in scopus
  • Hit : 294
  • Download : 0
DC FieldValueLanguage
dc.contributor.authorLee, Jun-Hoko
dc.contributor.authorKim, Hyunjungko
dc.date.accessioned2019-09-02T07:20:20Z-
dc.date.available2019-09-02T07:20:20Z-
dc.date.created2019-09-02-
dc.date.created2019-09-02-
dc.date.created2019-09-02-
dc.date.issued2016-05-
dc.identifier.citationIEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.29, no.2, pp.127 - 136-
dc.identifier.issn0894-6507-
dc.identifier.urihttp://hdl.handle.net/10203/266084-
dc.description.abstractCluster tools each of which consists of processing modules, a transport robot, and loadlocks perform most wafer fabrication processes in semiconductor manufacturing. Recently, the lot size has been decreasing from 25 wafers to even 7-8 wafers due to the larger wafer size and circuit width reduction especially in large-scale integration manufacturing. Hence, the lot switching operation between two consecutive wafer lots occurs frequently. In this paper, we derive closed-form expressions of the makespan of the lot switching period in single-armed and dual-armed cluster tools with the given robot task sequences for the first time. With this research, the completion time of a wafer lot can be easily estimated even though its preceding or next lot is processed together during the lot switching period. Hence, the makespan can be used for integrating operation of overhead hoist transports and cluster tools and assigning wafer lots to cluster tools while minimizing the lot switching period.-
dc.languageEnglish-
dc.publisherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC-
dc.titleMakespan Analysis of Lot Switching Period in Cluster Tools-
dc.typeArticle-
dc.identifier.wosid000375802900007-
dc.identifier.scopusid2-s2.0-84969769388-
dc.type.rimsART-
dc.citation.volume29-
dc.citation.issue2-
dc.citation.beginningpage127-
dc.citation.endingpage136-
dc.citation.publicationnameIEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING-
dc.identifier.doi10.1109/TSM.2016.2530810-
dc.contributor.localauthorKim, Hyunjung-
dc.contributor.nonIdAuthorLee, Jun-Ho-
dc.description.isOpenAccessN-
dc.type.journalArticleArticle-
dc.subject.keywordAuthorCluster tool-
dc.subject.keywordAuthorlot switching-
dc.subject.keywordAuthortransient period-
dc.subject.keywordAuthormakespan-
dc.subject.keywordAuthorcompletion time-
dc.subject.keywordPlusRESIDENCY TIME CONSTRAINTS-
dc.subject.keywordPlusSCHEDULING ANALYSIS-
dc.subject.keywordPlusSCHEDULABILITY-
dc.subject.keywordPlusHOIST-
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 32 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0