Showing results 1 to 3 of 3
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05 |
Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots Lee, Tae-Eog; Lee, HY; Lee, SJ, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.45, no.3, pp.487 - 507, 2007-02 |
SECAM: A Supervisory Equipment Control Application Model for Integrated Semiconductor Manufacturing Equipment, Lee, JH; Lee, Tae-Eog, IEEE ROBOTICS & AUTOMATION MAGAZINE, v.11, no.1, pp.41 - 58, 2004-03 |
Discover