Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Subject BOUND ALGORITHM

Showing results 1 to 17 of 17

1
A Multi-Manned Assembly Line Worker Assignment and Balancing Problem With Positional Constraints

Yang, Hyungjoon; Lee, Je-Hun; Lee, Sang Hyun; Lee, Seung Gi; Kim, Hyung Rok; Kim, Hyun-Jung, IEEE ROBOTICS AND AUTOMATION LETTERS, v.7, no.3, pp.7786 - 7793, 2022-07

2
A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times

Sung, Chang Sup; Kim, Hyun Ah, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.113, no.2, pp.1038 - 1048, 2008

3
Completion Time Analysis of Wafer Lots in Single-Armed Cluster Tools With Parallel Processing Modules

Lee, Jun-Ho; Kim, Hyunjung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.14, no.4, pp.1622 - 1633, 2017-10

4
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint

Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02

5
Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint

Sung, Chang Sup; Juhn, Jaeho, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.119, no.2, pp.392 - 401, 2009-03

6
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times

Jeong, Bong Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.47, pp.72 - 80, 2014-07

7
MINIMIZING TOTAL TARDINESS ON PARALLEL MACHINES SUBJECT TO FLEXIBLE MAINTENANCE

Lee, Ju-Yong; Kim, Yeong-Dae; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.4, pp.472 - 489, 2018-12

8
Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module

Kim, Dae-Kyu; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.55, no.11, pp.3092 - 3109, 2017-07

9
Reachability Tree-Based Optimization Algorithm for Cyclic Scheduling of Timed Petri Nets

Kim, Chulhan; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.18, no.3, pp.1441 - 1452, 2021-07

10
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07

11
Scheduling Algorithms for Minimizing Tardiness of Orders at the Burn-in Workstation in a Semiconductor Manufacturing System

Kim, Yeong-Dae; Kang, Jae-Hun; Lee, Gyeong-Eun; Lim, Seung-Kil, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.24, no.1, pp.14 - 26, 2011-02

12
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10

13
Scheduling In-Line Multiple Cluster Tools

Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05

14
Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning

Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.2, pp.1120 - 1136, 2022-04

15
Scheduling on parallel identical machines to minimize total tardiness

Shim, SO; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.177, pp.135 - 146, 2007-02

16
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

17
The design of capacitated facility networks for long term care service

Song, Byung Duk; Ko, Young Dae; Hwang, Hark, COMPUTERS & INDUSTRIAL ENGINEERING, v.89, pp.177 - 185, 2015-11

rss_1.0 rss_2.0 atom_1.0