Showing results 3 to 6 of 6
Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates Kim, Yeong-Dae; Kim, JG; Kim, HU, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.5, pp.589 - 598, 2001-10 |
Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05 |
Scheduling problems related with due date measures in parallel-machine shops = 병렬 기계 공정에서의 납기를 고려한 일정계획에 관한 연구link Shim, Sang-Oh; 심상오; et al, 한국과학기술원, 2006 |
Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication Facility Kim, Yeong-Dae; Joo, BJ; Choi, SY, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.23, pp.246 - 254, 2010-05 |
Discover