Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Subject tardiness

Showing results 3 to 6 of 6

3
Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates

Kim, Yeong-Dae; Kim, JG; Kim, HU, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.5, pp.589 - 598, 2001-10

4
Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date

Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05

5
Scheduling problems related with due date measures in parallel-machine shops = 병렬 기계 공정에서의 납기를 고려한 일정계획에 관한 연구link

Shim, Sang-Oh; 심상오; et al, 한국과학기술원, 2006

6
Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication Facility

Kim, Yeong-Dae; Joo, BJ; Choi, SY, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.23, pp.246 - 254, 2010-05

rss_1.0 rss_2.0 atom_1.0