Showing results 4 to 17 of 17
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02 |
Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint Sung, Chang Sup; Juhn, Jaeho, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.119, no.2, pp.392 - 401, 2009-03 |
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times Jeong, Bong Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.47, pp.72 - 80, 2014-07 |
MINIMIZING TOTAL TARDINESS ON PARALLEL MACHINES SUBJECT TO FLEXIBLE MAINTENANCE Lee, Ju-Yong; Kim, Yeong-Dae; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.4, pp.472 - 489, 2018-12 |
Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module Kim, Dae-Kyu; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.55, no.11, pp.3092 - 3109, 2017-07 |
Reachability Tree-Based Optimization Algorithm for Cyclic Scheduling of Timed Petri Nets Kim, Chulhan; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.18, no.3, pp.1441 - 1452, 2021-07 |
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07 |
Scheduling Algorithms for Minimizing Tardiness of Orders at the Burn-in Workstation in a Semiconductor Manufacturing System Kim, Yeong-Dae; Kang, Jae-Hun; Lee, Gyeong-Eun; Lim, Seung-Kil, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.24, no.1, pp.14 - 26, 2011-02 |
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10 |
Scheduling In-Line Multiple Cluster Tools Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05 |
Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.2, pp.1120 - 1136, 2022-04 |
Scheduling on parallel identical machines to minimize total tardiness Shim, SO; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.177, pp.135 - 146, 2007-02 |
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04 |
The design of capacitated facility networks for long term care service Song, Byung Duk; Ko, Young Dae; Hwang, Hark, COMPUTERS & INDUSTRIAL ENGINEERING, v.89, pp.177 - 185, 2015-11 |
Discover