Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Type Article

Showing results 1521 to 1540 of 2092

1521
Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date

Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05

1522
Scheduling In-Line Multiple Cluster Tools

Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05

1523
Scheduling Lot Switching Operations for Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11

1524
Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning

Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.2, pp.1120 - 1136, 2022-04

1525
Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints

Kim, Eun-Seok; Sung, Chang Sup; Lee, Ik-Sun, COMPUTERS & OPERATIONS RESEARCH, v.36, no.3, pp.698 - 710, 2009

1526
Scheduling of Products with Common and Product-Dependent ComponentsManufactured at a Single Facility

Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.8, pp.773 - 784, 1993-01

1527
Scheduling of Shipyard Block Assembly Process using Constraint Satisfaction Problem

Kim, H.; Kang, J.; Park, Sungsoo, ASIA PACIFIC MANAGEMENT REVIEW, v.7, no.1, pp.119 - 138, 2002-01

1528
Scheduling of step-improving jobs with an identical improving rate

Kim, Hyunjung; Kim, Eun-Seok; Lee, Jun-Ho, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.73, no.5, pp.1127 - 1136, 2022-05

1529
Scheduling on parallel identical machines to minimize total tardiness

Shim, SO; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.177, pp.135 - 146, 2007-02

1530
Scheduling problem in a two-machine flow line with the N- step prio-fob-dependent set-up times

Hwang, Hark, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.32, no.3, pp.375 - 385, 2001-01

1531
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

1532
Scheduling single-armed cluster tools with reentrant wafer flows

Lee, HY; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.19, no.2, pp.226 - 240, 2006-05

1533
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation

Kim, Tae-Kyu; Jung, Chihyun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.50, no.10, pp.2785 - 2795, 2012

1534
Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers

Kim, Hyun-Jung; Lee, Jun-Ho, COMPUTERS & OPERATIONS RESEARCH, v.126, 2021-02

1535
Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication Facility

Kim, Yeong-Dae; Joo, BJ; Choi, SY, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.23, pp.246 - 254, 2010-05

1536
Sculptured surface NC machining

Choi, Byoung Kyu; B.H.Kim; R.B.Jerard, COMPUTER AIDED GEOMETRIC DESIGN, 2002-08

1537
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process

Kim, Yeong-Dae; Lim, HG; Park, MW, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.91, no.1, pp.124 - 143, 1996-05

1538
Search heuristics for a parallel machine scheduling problem with ready times and due dates

Park, MW; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.33, no.3-4, pp.793 - 796, 1997-12

1539
Search Heuristics for a Parallel Machine Scheduling Problem with Ready Times and Due Dates

Kim, Y-D.; Park, Moon-Won, Computer and Industrial Engineering, vol.33, no.3-4, pp.793-796, 1997

1540
Search heuristics for resource constrained project scheduling

Lee, Jae-Kwan; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.47, no.5, pp.678 - 689, 1996-05

rss_1.0 rss_2.0 atom_1.0