Browse by Subject event graph

Showing results 1 to 7 of 7

1
Modeling and analysis of extended petri nets for discrete event systems with general time constraints = 일반화된 시간제약을 가진 이산사건 시스템을 위한 확장된 페트리 네트의 모델링 및 분석link

Lee, Byung-Seung; 이병승; et al, 한국과학기술원, 2006

2
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07

3
Scheduling and timing control of time-constrained cluster tools = 체재시간 제약을 갖는 클러스터장비의 스케줄링 및 시점제어link

Kim, Ja-Hee; 김자희; et al, 한국과학기술원, 2003

4
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10

5
Steady-state analysis and scheduling of cyclic job shops with overtaking

Seo, JW; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, v.14, no.4, pp.291 - 318, 2002-10

6
TFT-LCD 라인 In-Line Stocker의 모델링 방법론 = Development of modeling methodology for in-line stocker system in TFT-LCD linelink

구시정; Gu, Si-Jeong; et al, 한국과학기술원, 2009

7
다중 슬롯 클러스터 장비의 안정상태 스케줄링 및 모델링 = Steady state scheduling and modeling of multi-slot cluster toolslink

정치현; Jung, Chi-Hyun; 이태억; 김영대; et al, 한국과학기술원, 2006

rss_1.0 rss_2.0 atom_1.0