TOTAL COMPLETION-TIME; SINGLE-MACHINE; PERIODIC MAINTENANCE; MAKESPAN MINIMIZATION; TOOL CHANGES; TARDY JOBS; FLOW-TIME; PERFORMANCE; HEURISTICS; BREAKDOWN
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.66, no.9, pp.1542 - 1554
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.