Researcher Page

사진
Kim, Yeong-Dae (김영대)
교수, Department of Industrial & Systems Engineering(산업및시스템공학과)
Research Area
Manufacturing system design & operation , Production planning and scheduling in supply chains, Operations scheduling
Co-researchers
    Similar researchers

    Keyword Cloud

    Reload 더보기
    NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) Altmetrics
    1
    Article
    Production planning in a two-level supply chain for production-time-dependent products with dynamic demands

    Han, Jun-Hee; Lee, Ju-Yong; Kim, Yeong-Daeresearcher, COMPUTERS & INDUSTRIAL ENGINEERING, v.135, pp.1 - 9, 2019-09

    2
    Article
    MINIMIZING TOTAL TARDINESS ON PARALLEL MACHINES SUBJECT TO FLEXIBLE MAINTENANCE

    Lee, Ju-Yong; Kim, Yeong-Daeresearcher; Lee, Tae-Eogresearcher, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.4, pp.472 - 489, 2018-12

    3
    Article
    Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine

    Lee, Ju-Yong; Kim, Yeong-Daeresearcher, COMPUTERS & INDUSTRIAL ENGINEERING, v.114, pp.22 - 30, 2017-12

    4
    Article
    Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times

    An, Young-Jin; Kim, Yeong-Daeresearcher; Choi, Seong-Woo, COMPUTERS & OPERATIONS RESEARCH, v.71, pp.127 - 136, 2016-07

    5
    Article
    Design and operation of a two-level supply chain for production-time-dependent products using Lagrangian relaxation

    Han, Jun-Hee; Kim, Yeong-Daeresearcher, COMPUTERS & INDUSTRIAL ENGINEERING, v.96, pp.118 - 125, 2016-06

    6
    Article
    Algorithms for Aircraft Flight and Maintenance Scheduling in an Army Aviation Unit

    Lee, Dong-Hoon; Jeong, Bong-Joo; Kim, Bong-Kyun; et al, MILITARY OPERATIONS RESEARCH, v.21, no.3, pp.5 - 17, 2016

    7
    Article
    A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint

    Lee, Ju Yong; Kim, Yeong-Daeresearcher, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.66, no.9, pp.1542 - 1554, 2015-09

    8
    Article
    Finding a risk-constrained shortest path for an unmanned combat vehicle

    Bae, Kyung-Yeol; Kim, Yeong-Daeresearcher; Han, Jun Hee, COMPUTERS INDUSTRIAL ENGINEERING, v.80, pp.245 - 253, 2015-02

    9
    Article
    Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times

    Jeong, Bong Joo; Kim, Yeong-Daeresearcher, COMPUTERS & OPERATIONS RESEARCH, v.47, pp.72 - 80, 2014-07

    10
    Article
    Multiple-criterion shortest path algorithms for global path planning of unmanned combat vehicles

    Han, Du-Hyun; Kim, Yeong-Daeresearcher; Lee, Ju Yong, COMPUTERS & INDUSTRIAL ENGINEERING, v.71, pp.57 - 69, 2014-05

    11
    Article
    A Lagrangian heuristic algorithm for a public healthcare facility location problem

    Kim, Dong-Guen; Kim, Yeong-Daeresearcher, ANNALS OF OPERATIONS RESEARCH, v.206, no.1, pp.221 - 240, 2013-07

    12
    Article
    Scheduling healthcare services in a home healthcare system

    An, Y-J; Kim, Yeong-Daeresearcher; Jeong, B. J.; et al, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.63, no.11, pp.1589 - 1599, 2012-11

    13
    Article
    Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance

    Lee, Ju-Yong; Kim, Yeong-Daeresearcher, COMPUTERS OPERATIONS RESEARCH, v.39, no.9, pp.2196 - 2205, 2012-09

    14
    Article
    Heuristics for determining a patrol path of an unmanned combat vehicle

    Park, Chul-Hwan; Kim, Yeong-Daeresearcher; Jeong, BongJoo, COMPUTERS & INDUSTRIAL ENGINEERING, v.63, no.1, pp.150 - 160, 2012-08

    15
    Article
    Heuristics for locating two types of public health-care facilities

    Kim, Dong-Geun; Kim, Yeong-Daeresearcher; Lee, Taesikresearcher, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.11, no.2, pp.202 - 214, 2012-06

    16
    Article
    Multiproduct Lot Merging-Splitting Algorithms for Semiconductor Wafer Fabrication

    Bang, June-Young; Kim, Yeong-Daeresearcher; Choi, Seong-Woo, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.2, pp.200 - 210, 2012-05

    17
    Article
    Inventory control in a two-level supply chain with risk pooling effect

    Kang, Jae-Hun; Kim, Yeong-Daeresearcher, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.135, no.1, pp.116 - 124, 2012-01

    18
    Article
    Heuristic algorithms for assigning and scheduling flight missions in a military aviation unit

    Kim, Bong-Kyun; Kim, Yeong-Daeresearcher, COMPUTERS INDUSTRIAL ENGINEERING, v.61, no.4, pp.1309 - 1317, 2011-11

    19
    Article
    Scheduling algorithms for a semiconductor probing facility

    Bang, June-Young; Kim, Yeong-Daeresearcher, COMPUTERS & OPERATIONS RESEARCH, v.38, no.3, pp.666 - 673, 2011-03

    20
    Article
    Scheduling Algorithms for Minimizing Tardiness of Orders at the Burn-in Workstation in a Semiconductor Manufacturing System

    Kim, Yeong-Daeresearcher; Kang, Jae-Hun; Lee, Gyeong-Eun; et al, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.24, no.1, pp.14 - 26, 2011-02

    Load more items
    Loading...

    rss_1.0 rss_2.0 atom_1.0