Researcher Page

사진
Kim, Hyunjung (김현정)
조교수, Department of Industrial & Systems Engineering(산업및시스템공학과)
Research Area
Optimization, Production Management, Supply Chain Management
Co-researchers
    Similar researchers

    Keyword Cloud

    Reload 더보기
    NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
    1
    Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers

    Kim, Hyun-Jungresearcher; Lee, Jun-Ho, COMPUTERS & OPERATIONS RESEARCH, v.126, 2021-02

    2
    A Sequential Search Method of Dispatching Rules for Scheduling of LCD Manufacturing Systems

    Lee, Je-Hun; Kim, Young; Kim, Yun Bae; et al, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.33, no.4, pp.496 - 503, 2020-11

    3
    Item Assignment Problem in a Robotic Mobile Fulfillment System

    Kim, Hyun-Jungresearcher; Pais, Cristobal; Shen, Zuo-Jun Max, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.17, no.4, pp.1854 - 1867, 2020-10

    4
    Analysis of Backward Sequence for Single-Armed Cluster Tools With Processing Time Variations

    Lee, Jun-Ho; Kim, Jun-Horesearcher, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.17, no.4, pp.2167 - 2174, 2020-10

    5
    Digital twin-based cyber physical production system architectural framework for personalized production

    Park, Kyu Tae; Lee, Jehun; Kim, Hyun-Jungresearcher; et al, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.106, no.5-6, pp.1787 - 1810, 2020-01

    6
    Closed-Form Expressions on Lot Completion Time for Dual-Armed Cluster Tools With Parallel Processing Modules

    Kim, Hyunjungresearcher; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.2, pp.898 - 907, 2019-04

    7
    Three-machine flow shop scheduling with overlapping waiting time constraints

    Kim, Hyunjungresearcher; Lee, Jun-Ho, COMPUTERS & OPERATIONS RESEARCH, v.101, pp.93 - 102, 2019-01

    8
    Implementation of Cyber-Physical Production Systems for Quality Prediction and Operation Control in Metal Casting

    Lee, JuneHyuck; Noh, Sang Do; Kim, Hyunjungresearcher; et al, SENSORS, v.18, no.5, 2018-05

    9
    Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

    Yu, Tae Sun; Kim, Hyunjungresearcher; Lee, Tae-Eogresearcher, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

    10
    Bounds for parallel machine scheduling with predefined parts of jobs and setup time

    Kim, Hyunjungresearcher, ANNALS OF OPERATIONS RESEARCH, v.261, no.1-2, pp.401 - 412, 2018-02

    11
    Vulnerability Analysis of Evacuation Transportation Networks

    Kim, Jun; Lee, Je-Hun; Kim, Hyunjungresearcher; et al, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.5, pp.663 - 673, 2018

    12
    Completion Time Analysis of Wafer Lots in Single-Armed Cluster Tools With Parallel Processing Modules

    Lee, Jun-Ho; Kim, Hyunjungresearcher, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.14, no.4, pp.1622 - 1633, 2017-10

    13
    A Branch and Bound Algorithm for Three-Machine Flow Shop with Overlapping Waiting Time Constraints

    Kim, Hyunjungresearcher; Lee, JH, IFAC PAPERSONLINE, v.50, no.1, pp.1101 - 1105, 2017-07

    14
    Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module

    Kim, Dae-Kyu; Kim, Hyunjungresearcher; Lee, Tae-Eogresearcher, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.55, no.11, pp.3092 - 3109, 2017-07

    15
    Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs

    Yu, Tae Sun; Kim, Hyunjungresearcher; Lee, Tae-Eogresearcher, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05

    16
    Characterizing Token Delays of Timed Event Graphs for K-Cyclic Schedules

    Lee, Tae-Eogresearcher; Kim, Hyunjungresearcher; Roh, Dong-Hyun; et al, IEEE TRANSACTIONS ON AUTOMATIC CONTROL, v.62, no.2, pp.961 - 966, 2017-02

    17
    골든 타임을 고려한 신속한 혈액 공급사슬 설계

    김성일; 김준; 김현정researcher; et al, 로지스틱스연구, v.24, no.4, pp.27 - 40, 2016-12

    18
    Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation

    Kim, Hyunjungresearcher; Lee, Jun-Ho; Lee, Tae-Eogresearcher, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07

    19
    Makespan Analysis of Lot Switching Period in Cluster Tools

    Lee, Jun-Ho; Kim, Hyunjungresearcher, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.29, no.2, pp.127 - 136, 2016-05

    20
    Optimal Scheduling of Transient Cycles for Single-Armed Cluster Tools With Parallel Chambers

    Kim, Dae-Kyu; Lee, Tae-Eogresearcher; Kim, Hyunjungresearcher, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1165 - 1175, 2016-04

    Load more items
    Loading...

    rss_1.0 rss_2.0 atom_1.0