Routes selection for the cell formation problem with alternative part process plans

Cited 38 time in webofscience Cited 44 time in scopus
  • Hit : 379
  • Download : 0
This article proposes a two stage procedure for the cell formation problem with alternative process plans. At the first stage of the procedure, the route selection problem is solved with the objective of maximizing the sum of compatibility coefficients among selected process plans. At the second stage, part families are formed based on the result of the first stage using the p-median problem. The grouping solutions based on the proposed procedure are compared with those of the generalized p-median model in terms of the number of exceptional elements, grouping efficiency and grouping efficacy. Copyright (C) 1996 Elsevier Science Ltd
Publisher
PERGAMON-ELSEVIER SCIENCE LTD
Issue Date
1996-07
Language
English
Article Type
Article
Keywords

GROUP TECHNOLOGY; DESIGN

Citation

COMPUTERS INDUSTRIAL ENGINEERING, v.30, no.3, pp.423 - 431

ISSN
0360-8352
DOI
10.1016/0360-8352(96)00011-3
URI
http://hdl.handle.net/10203/72655
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 38 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0