IE-Journal Papers(저널논문)

Recent Items

Collection's Items (Sorted by Submit Date in Descending order): 1561 to 1580 of 2154

1561
ESTIMATION METHODS FOR THE MEAN OF THE EXPONENTIAL-DISTRIBUTION BASED ON GROUPED AND CENSORED-DATA

SEO, SK; Yum, Bong-Jin, IEEE TRANSACTIONS ON RELIABILITY, v.42, no.1, pp.87 - 96, 1993-03

1562
Flow Line 분석을 위한 시스템 모델링 및 시뮬레이션 연구

최병규; 박정현; 황문호; 김재희, 대한산업공학회지, v.4, no.1, pp.71 - 81, 1991-06

1563
Construction of Curve-Net Interpolation Surface Considering Trajectory of Cross-Section Curves

유우식; 신하용; 최병규, 대한산업공학회지, v.20, no.2, pp.77 - 90, 1994

1564
Incremental Feature Generation and Modification during Design Evolution

Hyowon Suh, KSME INTERNATIONAL JOURNAL, v.8, no.4, pp.422 - 435, 1994

1565
경계표현법을 기본으로 한 특징형상 모델러의 개발

홍상훈; 서효원; 이상조, 대한기계학회논문집 A, v.17, no.10, pp.2446 - 2456, 1993-10

1566
작업일정계획문제 해결을 위한 유전 알고리듬의 응용

김석준; 이채영, JOURNAL OF THE KOREAN OR/MS SOCIETY, v.17, no.3, pp.1 - 12, 1992

1567
Optimal Allocation of Test Items in an Accelerated Life Test under Model Uncertainty

최영식; 염봉진, 대한산업공학회지, v.14, no.2, pp.91 - 97, 1988-12

1568
통계 전문가 시스템에 관한 문헌 연구

염봉진; 최경미; 김준하; 김영준, 응용통계연구, v.2, no.2, pp.91 - 101, 1989-01

1569
계기 검교정간의 보증시험 절차의 개발

염봉진; 조재균; 이동화, 산업공학(IE INTERFACES), v.6, no.1, pp.55 - 65, 1993-01

1570
OPTIMAL INSPECTION POLICIES IN A SERIAL PRODUCTION SYSTEM INCLUDING SCRAP REWORK AND REPAIR - AN MILP APPROACH

Yum, Bong-Jin; MCDOWELL, ED, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.25, no.10, pp.1451 - 1464, 1987-10

1571
ANALYSIS OF THE PREDICTION-PROBLEM WITH ERRORS IN THE VARIABLES

YUM, BJ; Yum, Bong-Jin, IIE TRANSACTIONS, v.22, no.1, pp.73 - 83, 1990-03

1572
LARGE-SAMPLE COMPARISONS OF CALIBRATION PROCEDURES WHEN BOTH MEASUREMENTS ARE SUBJECT TO ERROR - THE UNREPLICATED CASE

Seung Hoon Lee; Yum, Bong-Jin, COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, v.18, no.10, pp.3821 - 3840, 1989

1573
Protrusion and depression generation for concurrent engineering

Suh, Hyo-Won; R L S Ahluwalia; J E Miller, JOURNAL OF DESIGN AND MANUFACTURING, v.1, no.3, pp.159 - 166, 1993-01

1574
직교 회귀의 역학적 고찰

채경철, 응용통계연구, v.3, no.1, pp.47 - 58, 1990

1575
RESOLUTION OF MULTIPLE CONFLICTS IN THE PETRI-NET MODEL OF FAS

SON, SK; Choi, Byoung Kyu; PARK, TU; Lee, Kwang-Hyung, INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.4, no.4, pp.253 - 262, 1991

1576
Large-Sample Comparisons of Statistical Calibration Procedures When the Standard Measurement is Also Subject to Error: The Replicated Case

이승훈; 염봉진, 한국통계학회지, v.17, no.1, pp.9 - 23, 1988

1577
작업스케쥴링 문제해결을 위한 Branch and Bound 해법의 비교분석(Heuristic Aspects of the Branch and Bound Procedure For a Job Scheduling Problem)

고석주; 이채영, 대한산업공학회지, v.18, no.2, pp.141 - 147, 1992

1578
Simulation Analyses of Finishing Processes in a Tire Manufacturing system

최재영; 이채영, 경영과학, v.7, no.1, pp.44 - 52, 1990-07

1579
완제품 타이어 제조공정의 시뮬레이션 분석

최재영; 이채영, 경영과학, v.7, no.1, pp.44 - 52, 1990-06

1580
An Expert System for Fault Diagnoses of Local Area Networks

최재영; 이채영, JOURNAL OF THE KOREAN OR/MS SOCIETY, v.16, no.1, pp.35 - 44, 1991-07

Discover

Type

Open Access

Date issued

. next

Subject

. next

rss_1.0 rss_2.0 atom_1.0