Song, Hwanjun; Bang, Jihwan, PATTERN RECOGNITION, v.155, 2024-11
Mahmoudinazlou, Sasan; Kwon, Changhyun, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.318, no.3, pp.719 - 739, 2024-11
Jung, Gyuwon; Park, Sangjun; Ma, Eun-Yeol; Kim, Heeyoung; Lee, Uichin, ACM COMPUTING SURVEYS, v.56, no.9, 2024-09
Park, Yeontark; Lee, Jong-Seok, EXPERT SYSTEMS WITH APPLICATIONS, v.249, 2024-09
Chung Chang Hyun; Jang Young Jae, APPLIED SOFT COMPUTING, v.161, 2024-08
WAN, JIANSONG; Lee, Kanghoon; Hayong Shin, ADVANCED ENGINEERING INFORMATICS, v.61, 2024-08
Jonathan, Erik; Xiong, Shuping, Ergonomics, 2024-07
Byrne, Elizabeth H.; Song, Hoseung; Srinivasan, Sujatha; Fredricks, David N.; Reed, Susan D.; Guthrie, Katherine A.; Wu, Michael; Mitchell, Caroline M., MENOPAUSE-THE JOURNAL OF THE MENOPAUSE SOCIETY, v.31, no.7, pp.575 - 581, 2024-07
Kwak, Seung Woo; Ahn, Jeongyoun; Lee, Jaewoo; Park, Cheolwoo, ECONOMETRICS AND STATISTICS, v.31, pp.81 - 99, 2024-07
Kim, Jieun; Lee, Chang-Hun; Yi, Mun Yong, INTERNATIONAL JOURNAL OF AERONAUTICAL AND SPACE SCIENCES, v.25, no.3, pp.1105 - 1120, 2024-07
K-terminal reliability of FDDI ring network with a constrained number of consecutively bypassed stations Park, Kyung Soo; Jung, GW, IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, v.E84-A, no.11, pp.2923 - 2929, 2001-11 |
Operator-scheduling using a constraint satisfaction technique in port container terminals Kim, KH; Kim, KW; Hwang, Hark; Ko, CS, COMPUTERS & INDUSTRIAL ENGINEERING, v.46, no.2, pp.373 - 381, 2004-04 |
A dispatching algorithm for multiple-load AGVS using a fuzzy decision-making method in a job shop environment Kim, DB; Hwang, Hark, ENGINEERING OPTIMIZATION, v.33, no.5, pp.523 - 547, 2001-01 |
A unified queue length formula for BMAP/G/1 queue with generalized vacations Chang, SH; Takine, T; Chae, Kyung-Chul; Lee, HW, STOCHASTIC MODELS, v.18, no.3, pp.369 - 386, 2002 |
The conversion of a dynamic B-spline curve into piecewise polynomials in power form Kim, DS; Ryu, J; Lee, HC; Shin, Hayong, COMPUTER-AIDED DESIGN, v.34, no.4, pp.337 - 345, 2002-04 |
A stock location rule for a low level picker-to-part system Hwang, Hark, ENGINEERING OPTIMIZATION, v.35, no.3, pp.285 - 295, 2003-06 |
Optimal tooling policy for a tool switching problem of a flexible machine with automatic tool transporter Hwang, Hark, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.40, no.4, pp.873 - 883, 2002-01 |
A Note on the Relationships among the Queue Lengths at Various Epochs of a Queue with BMAP Arrivals Kim, NK; Chae, Kyung-Chul; Lee, HW, MSFE(MANAGEMENT SCIENCE & FINANCIAL ENGINEERING), v.9, no.2, pp.1 - 12, 2003-11 |
자치제어구조 생산시스템에서 무인운반차량 시스템의 운영정책 개발 황학; 김상휘, JOURNAL OF THE KOREAN INSTITUTE OF INDUSTRIAL ENGINEERS, v.23, no.2, pp.343 - 357, 1997-01 |
A model-based and computer-aided approach to analysis of human errors in nuclear power plants Yoon, Wan Chul; Lee, YH; Kim, YS, RELIABILITY ENGINEERING SYSTEM SAFETY, v.51, no.1, pp.43 - 52, 1996 |
The Effects of Principle Knowledge in Novel Fault Diagnosis Dong Han Ham; Yoon, Wan Chul, PROCEEDINGS OF THE FIRST ASIA-PACIFIC DECISION SCIENCES INSTITUTE CONFERENCE, v.0, no.0, pp.937 - 944, 1997 |
User interface design and evaluation based on task analysis Yoon, Wan Chul; Ji S. Park, THE INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH, v.1, pp.598 - 601, 1997 |
공간적응절차를 통한 웨이퍼 가공 공정의 로버스트한 작업배정규칙 결정 백동현; 윤완철; 박상찬, 대한산업공학회지, v.23, no.1, pp.129 - 146, 1997-03 |
공간 적응 절차를 통한 웨이퍼 가공 공정의 로버스트한 작업배정 규칙 결정 백동현; 윤완철; 박상찬, 대한 산업공학회지, v.23, no.1, pp.129 - 146, 1997-01 |
진단 수행도에 대한 지식형태의 효용에 관한 연구 함동한; 윤완철, 대한산업공학회지, v.22, no.3, pp.399 - 412, 1996-01 |
QUBICS: A general quantity base management system Yoon, Wan Chul, APPLIED INTELLIGENCE, v.5, no.4, pp.367 - 380, 1995-10 |
진단 수행도에 대한 지식형태의 효용에 관한 연구 함동한; 윤완철, 대한산업공학회지, v.22, no.3, pp.399 - 412, 1996-09 |
주문생산방식을 따르는 조립시스템에서의 생산계획 및 일정계획을 위한 알고리듬 박문원; 김영대, 대한산업공학회지, v.24, no.3, pp.345 - 357, 1998-09 |
A Lagrangian Relaxation Approach to Capacity Planning for a Manufacturing System with Flexible and Dedicated Machines 임승길; 김영대, 한국경영과학회지, v.23, no.2, pp.47 - 65, 1998-06 |
Search heuristics for a parallel machine scheduling problem with ready times and due dates Park, MW; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.33, no.3-4, pp.793 - 796, 1997-12 |
Discover