Proposed Method to Predict Core Inventory History and Operator Time Margin during Small Break Accident소규모의 냉각재 상실 사고시 노심내 냉각재 양의 추정과 운전원 시간마진 예측을 위해 제안된 방법

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 484
  • Download : 0
DC FieldValueLanguage
dc.contributor.authorNo, Hee Cheonko
dc.date.accessioned2013-02-25T08:58:40Z-
dc.date.available2013-02-25T08:58:40Z-
dc.date.created2012-02-06-
dc.date.created2012-02-06-
dc.date.issued1983-01-
dc.identifier.citationNUCLEAR ENGINEERING AND TECHNOLOGY , v.15, no.4, pp.219 - 228-
dc.identifier.issn0372-7327-
dc.identifier.urihttp://hdl.handle.net/10203/60995-
dc.description.abstractThe blowdown history of the TMI-2 accident up to the isolation of the relief valve associated with a small break LOCA is reviewed briefly. An analysis is made to determine what instruments should be added in the core in order to prevent core damage in the case of the TMI-2 accident. With the added instruments a procedure is presented on how to predict the uncovered level of the core and how to calculate operator time margin. Sample calculations are done for the TMI-2 accident to determine the uncovered level and operator time margin. Finally, the map to show the uncovered level of the core and operator time margin is drawn with measurable parameters by the above methods.-
dc.languageEnglish-
dc.publisher한국원자력학회-
dc.titleProposed Method to Predict Core Inventory History and Operator Time Margin during Small Break Accident-
dc.title.alternative소규모의 냉각재 상실 사고시 노심내 냉각재 양의 추정과 운전원 시간마진 예측을 위해 제안된 방법-
dc.typeArticle-
dc.type.rimsART-
dc.citation.volume15-
dc.citation.issue4-
dc.citation.beginningpage219-
dc.citation.endingpage228-
dc.citation.publicationnameNUCLEAR ENGINEERING AND TECHNOLOGY-
dc.contributor.localauthorNo, Hee Cheon-
Appears in Collection
NE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0