Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 1-10 of 18 (Search time: 0.007 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
1
Offshore port service concepts: classification and economic feasibility

Kim, Jonghoe; Morrison, James R., FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, v.24, no.3, pp.214 - 245, 2012-09

2
Robust vehicle routing problem with deadlines and travel time/demand uncertainty

Lee, C.; Lee, K.; Park, Sungsoo, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.63, no.9, pp.1294 - 1306, 2012-09

3
Heuristics for determining a patrol path of an unmanned combat vehicle

Park, Chul-Hwan; Kim, Yeong-Dae; Jeong, BongJoo, COMPUTERS & INDUSTRIAL ENGINEERING, v.63, no.1, pp.150 - 160, 2012-08

4
Fire scheduling for planned artillery attack operations under time-dependent destruction probabilities

Cha, YH; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.38, pp.383 - 392, 2010-10

5
A berth allocation planning problem with direct transshipment consideration

Liang, Chengji; Hwang, Hark; Gen, Mitsuo, JOURNAL OF INTELLIGENT MANUFACTURING, v.23, no.6, pp.2207 - 2214, 2012-12

6
Chebyshev center based column generation

Lee, Chung Mok; Park, Sungsoo, DISCRETE APPLIED MATHEMATICS, v.159, no.18, pp.2251 - 2265, 2011-12

7
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes

Chien, CF; Dauzere-Peres, S; Ehm, H; Fowler, JW; Jiang, ZB; Krishnaswamy, S; Lee, Tae-Eog; Monch, L; Uzsoy, R, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.5, no.3, pp.254 - 271, 2011

8
A three-level supply chain network design model with risk-pooling and lead times

Park, Sukun; Lee, Tae-Eog; Sung, Chang Sup, TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, v.46, no.5, pp.563 - 581, 2010-09

9
Noncyclic Scheduling for Timed Discrete-Event Systems With Application to Single-Armed Cluster Tools Using Pareto-Optimal Optimization

Uno, Wikborg; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.3, pp.699 - 710, 2013-07

10
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times

An, Young-Jin; Kim, Yeong-Dae; Choi, Seong-Woo, COMPUTERS & OPERATIONS RESEARCH, v.71, pp.127 - 136, 2016-07

rss_1.0 rss_2.0 atom_1.0