Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 1-10 of 38 (Search time: 0.005 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
1
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation

Kim, Tae-Kyu; Jung, Chihyun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.50, no.10, pp.2785 - 2795, 2012

2
Cyclic Scheduling of Cluster Tools With Nonidentical Chamber Access Times Between Parallel Chambers

Kim, Dae-Kyu; Jung, Yu-Ju; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.3, pp.420 - 431, 2012-08

3
An Efficient Mixed Integer Programming Model Based on Timed Petri Nets for Diverse Complex Cluster Tool Scheduling Problems

Jung, Chihyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.2, pp.186 - 199, 2012-05

4
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes

Chien, CF; Dauzere-Peres, S; Ehm, H; Fowler, JW; Jiang, ZB; Krishnaswamy, S; Lee, Tae-Eog; Monch, L; Uzsoy, R, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.5, no.3, pp.254 - 271, 2011

5
A three-level supply chain network design model with risk-pooling and lead times

Park, Sukun; Lee, Tae-Eog; Sung, Chang Sup, TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, v.46, no.5, pp.563 - 581, 2010-09

6
Noncyclic Scheduling for Timed Discrete-Event Systems With Application to Single-Armed Cluster Tools Using Pareto-Optimal Optimization

Uno, Wikborg; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.3, pp.699 - 710, 2013-07

7
Steady state analysis of timed event graphs with time window constraints

Lee, Tae-Eog; Park, Seong-Ho; Jung, Chihyun, DISCRETE APPLIED MATHEMATICS, v.167, pp.202 - 216, 2014-04

8
Modeling, Analysis, and Scheduling of Cluster Tools With Two Independent Arms

Tonke, Daniel; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1176 - 1188, 2016-04

9
Feedback Control of Cluster Tools for Regulating Wafer Delays

Kim, Chulhan; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1189 - 1199, 2016-04

10
Modelling and simulation of automated manufacturing systems for evaluation of complex schedules

Kim, Chulhan; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3734 - 3747, 2013-06

rss_1.0 rss_2.0 atom_1.0