Results 1-8 of 8 (Search time: 0.004 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Joint configuration of backbone and logical networks on a reconfigurable packet-switched network with unreliable links Lee, JH; Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.30, no.3, pp.309 - 331, 1998-04 | |
Minimizing Total Weighted Completion Time at a Pre-assembly Stage Composed of Tow Feeding Machines Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.54, no.3, pp.247 - 255, 1998-04 | |
A simulated annealing algorithm for resource constrained project scheduling problems Cho, JH; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.48, no.7, pp.736 - 744, 1997-07 | |
Search heuristics for resource constrained project scheduling Lee, Jae-Kwan; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.47, no.5, pp.678 - 689, 1996-05 | |
A heuristic algorithm for a production planning problem in an assembly system Park, MW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.2, pp.138 - 147, 1999-02 | |
A decomposition approach to a multi-period vehicle scheduling problem Kim, JU; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.27, no.4, pp.421 - 430, 1999-08 | |
Algorithms for a class of single-machine weighted tardiness and earliness problems Yano, C.A.; Kim, Yeong-Dae, European Journal of Operational Research, v.52, no.2, pp.167 - 178, 1991-05 | |
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process Kim, Yeong-Dae; Lim, HG; Park, MW, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.91, no.1, pp.124 - 143, 1996-05 |
Discover