Results 1-6 of 6 (Search time: 0.004 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Search heuristics for a parallel machine scheduling problem with ready times and due dates Park, MW; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.33, no.3-4, pp.793 - 796, 1997-12 | |
Multi-period part selection and loading problems in flexible manufacturing systems Lee, D.H; Lim, S.K; Lee, G.C; Jun, H.B; Kim, Yeong-Dae, COMPUTERS & INDUSTRIAL ENGINEERING , v.33, no.3-4, pp.541 - 544, 1997-12 | |
A simulated annealing algorithm for resource constrained project scheduling problems Cho, JH; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.48, no.7, pp.736 - 744, 1997-07 | |
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter Roh, HK; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.35, pp.2989 - 3003, 1997 | |
Algorithms for determining capacities of individual buffers in assembly/disassembly systems Jeong, KC; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.33, no.3-4, pp.605 - 608, 1997-12 | |
Impact of throughput-based objectives and machine grouping decisions on the short-term performance of flexible manufacturing systems Kim, Yeong-Dae; Yano, CA, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.35, no.12, pp.3303 - 3322, 1997-12 |
Discover