Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 1-7 of 7 (Search time: 0.003 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
1
Toot requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint

Kim, Yeong-Dae; Lee, GC; Lim, SK; Choi, SK, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.41, no.14, pp.3339 - 3357, 2003-09

2
Algorithms for adjusting shapes of departments in block layouts on the grid-based plane

Lee, GC; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.28, no.1, pp.111 - 122, 2000-02

3
A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system

Lee, GC; Kim, Yeong-Dae; Kim, JG; Choi, SH, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.54, no.10, pp.1038 - 1049, 2003-10

4
Tool requirements planning in a flexible manufacturing system with an automatic tool transporter

Kim, Yeong-Dae; Lee, GC; Choi, SK; Lim, SK, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.6, pp.795 - 804, 2001-12

5
Bottleneck-focused scheduling for a hybrid flowshop

Lee, GC; Kim, Yeong-Dae; Choi, SW, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.165 - 181, 2004-01

6
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop

Choi, SW; Kim, Yeong-Dae; Lee, GC, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.43, pp.2149 - 2167, 2005-06

7
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness

Lee, GC; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.4731 - 4743, 2004-11

rss_1.0 rss_2.0 atom_1.0