Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 1-7 of 7 (Search time: 0.007 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
1
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net

Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07

2
Scheduling analysis of time-constrained dual-armed cluster tools

Kim, JH; Lee, Tae-Eog; Lee, HY; Park, DB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.16, no.3, pp.521 - 534, 2003-08

3
Modeling and implementing a real-time scheduler for dual-armed cluster tools

Shin, YH; Lee, Tae-Eog; Kim, JH; Lee, HY, COMPUTERS IN INDUSTRY, v.45, no.1, pp.13 - 27, 2001-05

4
Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows

Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.3, pp.1058 - 1070, 2019-07

5
Wafer delay analysis and control of dual-armed cluster tools with chamber cleaning operations

Yu, Tae-Sun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.58, no.2, pp.434 - 447, 2020-01

6
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

7
Scheduling dual-armed cluster tools with cleaning processes

Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06

rss_1.0 rss_2.0 atom_1.0