Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 1-10 of 11 (Search time: 0.013 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
1
An Efficient Mixed Integer Programming Model Based on Timed Petri Nets for Diverse Complex Cluster Tool Scheduling Problems

Jung, Chihyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.2, pp.186 - 199, 2012-05

2
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net

Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07

3
Modeling, Analysis, and Scheduling of Cluster Tools With Two Independent Arms

Tonke, Daniel; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1176 - 1188, 2016-04

4
Scheduling single-armed cluster tools with reentrant wafer flows

Lee, HY; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.19, no.2, pp.226 - 240, 2006-05

5
An extended event graph with negative places and tokens for time window constraints

Lee, Tae-Eog; Park, SH, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.2, no.4, pp.319 - 332, 2005-10

6
Petri net modeling and scheduling for cyclic job shops with blocking

Song, JS; Lee, Tae-Eog, COMPUTERS & INDUSTRIAL ENGINEERING, v.34, no.2, pp.281 - 295, 1998-04

7
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

8
Characterizing Token Delays of Timed Event Graphs for K-Cyclic Schedules

Lee, Tae-Eog; Kim, Hyunjung; Roh, Dong-Hyun; Sreenivas, Ramavarapu S., IEEE TRANSACTIONS ON AUTOMATIC CONTROL, v.62, no.2, pp.961 - 966, 2017-02

9
Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04

10
Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots

Kim, Hyun-Jung; Lee, Jun-Ho; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.1, pp.145 - 159, 2013-01

rss_1.0 rss_2.0 atom_1.0