Results 21-30 of 63 (Search time: 0.005 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Routes selection for the cell formation problem with alternative part process plans Hwang, Hark; Ree, P, COMPUTERS INDUSTRIAL ENGINEERING, v.30, no.3, pp.423 - 431, 1996-07 | |
Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop Lee, DH; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.34, no.5, pp.1347 - 1360, 1996-05 | |
분기 및 접합형태를 갖는 대기행렬 모형의 근사적인 분석 양원석; 채경철, 대한산업공학회지, v.22, no.3, pp.377 - 385, 1996 | |
Two-stage Procedure for the Cell Formation Problem with Alternative Part Processing Routes Hwang, Hark, ENGINEERING OPTIMIZATION, v.26, no.3, pp.159 - 170, 1996-01 | |
Bezier control point for the image of domain curve on a Bezier surface 신하용, 한국CAD/CAM학회 논문집, v.1, no.2, pp.158 - 162, 1996 | |
Design of capacitated networks with tree configurations Lee, K; Park, K; Park, Sungsoo, TELECOMMUNICATION SYSTEMS, v.6, no.1, pp.1 - 19, 1996 | |
An extended formulation approach to the edge-weighted maximal clique problem Park, K; Lee, K; Park, Sungsoo, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.95, no.3, pp.671 - 682, 1996-12 | |
An integer programming approach to the bandwidth packing problem Park, K; Kang, S; Park, Sungsoo, MANAGEMENT SCIENCE, v.42, no.9, pp.1277 - 1291, 1996-09 | |
A Distributed Dynamic Channel Assignment Algorithm in Highway Microcells 이채영; 박현정, 한국경영과학회지, v.21, no.2, pp.187 - 201, 1996 | |
Human Scheduling Performance in a Computer-aided Jobshop Scheduling Task D.H. Baek; S.Y.Oh; Yoon, Wan Chul, PROCEEDINGS OF 20TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, v.0, no.0, pp.753 - 760, 1996 |
Discover