Results 21-30 of 34 (Search time: 0.008 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
3차원 물품 적재에 관한 마이크로 컴퓨터용 프로그램 개발 Hwang, Hark; Lee, Kwan-Jae; Sun, Ji-Ung, 대한산업공학회지, v.23, no.1, pp.55 - 76, 1997 | |
A genetic-algorithm-based heuristic for the GT cell formation problem Hwang, Hark; Sun, JU, COMPUTERS INDUSTRIAL ENGINEERING, v.30, no.4, pp.941 - 955, 1996-09 | |
Retailer's pricing and lot sizing policy for exponentially deteriorating products under the condition of permissible delay in payments Hwang, Hark, COMPUTERS & OPERATIONS RESEARCH, v.24, no.6, pp.539 - 547, 1997-01 | |
SEQUENCING PICKING OPERATIONS AND TRAVEL TIME MODELS FOR MAN-ON-BOARD STORAGE AND RETRIEVAL WAREHOUSING SYSTEM Hwang, Hark; jin-young song, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.29, no.1, pp.75 - 88, 1993 | |
An adaptive dispatching algorithm for automated guided vehicles based on an evolutionary process Kim, SH; Hwang, Hark, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.60-1, pp.465 - 472, 1999-04 | |
Production Sequencing Problem with Reentrant Work Flows and Sequence Dependent Setup Times Hwang, Hark, COMPUTERS & INDUSTRIAL ENGINEERING, v.33, no.3, pp.773 - 776, 1997-01 | |
An Optimal Credit Policy to increace Supplier's Profit with Price dependent Demand Functions junsik kim; Hwang, Hark; seong whan shin, PRODUCTION PLANNING & CONTROL, v.6, no.1, pp.45 - 50, 1995-01 | |
AN IMPROVED VERSION OF THE PRODUCTION SWITCHING HEURISTIC FOR THE AGGREGATE PRODUCTION PLANNING PROBLEM Hwang, Hark; CHA, CN, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.33, no.9, pp.2567 - 2577, 1995-09 | |
OPTIMAL-CONTROL OF WORK-IN-PROCESS WITH DUAL LIMIT SWITCHES IN 2-STAGE TRANSFER LINE Hwang, Hark; KOH, SG, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.63, no.1, pp.66 - 75, 1992-11 | |
A Production Inventory Model for Producing Two-Products at a Single Facility with Deteriorating Raw Materials Hwang, Hark; duk hee. moon, COMPUTERS & INDUSTRIAL ENGINEERING, v.20, no.1, pp.141 - 147, 1991 |
Discover