Results 11-20 of 25 (Search time: 0.007 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Reliability of a System with Standbys and Spares 박경수, 대한산업공학회지, v.3, no.1, 1977-11 | |
서울시(市) 신호체제의 적정 phase split 과 연쇄화를 위한 최적 offset 박경수, 대한산업공학회지, v.3, no.1, pp.49 - 53, 1977-04 | |
A Biomechanical Evaluation of Two Methods of Manual Load Lifting Park, Kyung Soo, AIIE TRANSACTIONS, v.6, no.2, 1974-06 | |
Thermal stability of superconductors with large surface barriers to flux entry: Superconducting power‐line conductors Kim, Sehun; Howard, R.E; Beasley, M.R, JOURNAL OF APPLIED PHYSICS, v.49, no.2, pp.730 - 735, 1978-02 | |
OPTIMAL NUMBER OF MINIMAL REPAIRS BEFORE REPLACEMENT Park, Kyung Soo, IEEE TRANSACTIONS ON RELIABILITY, v.28, no.2, pp.137 - 140, 1979-06 | |
A Longitudinal Study of Low-Back Pain and Its Relation to Occupational Weight Lifting Factors Park, Kyung Soo, AMERICAN AMERICAN INDUSTRIAL HYGIENE ASSOCIATION JOURNAL, v.34, no.12, 1973-12 | |
Two Forms of Preventive Replacement Policy with Minimal Repair at Failure 박경수, 대한산업공학회지, v.4, no.1, pp.1 - 3, 1978-06 | |
Dynamics of Heterogeneous Warfare 박경수, 한국통계학회지, v.6, no.1, 1977-06 | |
A Heuristic Algorithm for the Quadratic Assigment Proble and its Application Hark Hwang; C. H. Chun, 대한산업공학회지, v.5, no.1, pp.45 - 51, 1979 | |
다품목 생산체제의 생산계획을 위한 모델 최병규, 대한산업공학회지, v.1, no.2, pp.27 - 38, 1975 |