Results 11-20 of 77 (Search time: 0.006 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Technical Note on a Parallel-Facilities Production Planning Model with CapacityConstraints Sung, Chang Sup; j. h. byun, COMPUTERS AND OPERATIONS RESEARCH, v.15, no.6, pp.585 - 587, 1988-01 | |
Determination of Automated Storage/Retrieval System Size Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.19, no.4, pp.269 - 286, 1992-01 | |
A real-time algorithm for timeslot assignment in ISM system with DVB-RCS Lee, Ik Sun; Sung, Chang Sup; Jin, Gwang-Ja; Han, Ki Seop, ETRI JOURNAL, v.29, no.3, pp.329 - 335, 2007-06 | |
Configuring Both Backbone and Logical Networks for a Reconfigurable Network with Link Failures Allowed Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.26, no.0, pp.227 - 249, 1996-04 | |
A component-based product data management system Sung, Chang Sup; Park, Sam Joon, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.33, no.5-6, pp.614 - 626, 2007 | |
Reliability Optimization of a Series System with Multiple-Choice and Budget Constraints Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.127, no.1, pp.159 - 171, 2000-11 | |
Development process of nuclear power industry in a developing country: Korean experience and implications Sung, Chang Sup; Hong, SK, TECHNOVATION, v.19, no.5, pp.305 - 316, 1999-05 | |
Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed Sung, Chang Sup; Yoon, SH, ENGINEERING OPTIMIZATION, v.28, no.3, pp.231 - 243, 1997-04 | |
Branch-and-Bound Approach for a Stochastic Production Planning Problem with capacity Constraints Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.31, no.4, pp.532 - 550, 1988-12 | |
A three-level supply chain network design model with risk-pooling and lead times Park, Sukun; Lee, Tae-Eog; Sung, Chang Sup, TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, v.46, no.5, pp.563 - 581, 2010-09 |
Discover