Results 21-30 of 66 (Search time: 0.005 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
DEVELOPMENT OF LIFE-TEST SAMPLING PLANS FOR EXPONENTIAL-DISTRIBUTIONS BASED ON ACCELERATED LIFE TESTING Yum, Bong-Jin; KIM, SH, COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, v.19, no.7, pp.2735 - 2743, 1990 | |
LARGE-SAMPLE COMPARISONS OF CALIBRATION PROCEDURES WHEN BOTH MEASUREMENTS ARE SUBJECT TO ERROR - THE UNREPLICATED CASE Seung Hoon Lee; Yum, Bong-Jin, COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, v.18, no.10, pp.3821 - 3840, 1989 | |
OPTIMAL INSPECTION POLICIES IN A SERIAL PRODUCTION SYSTEM INCLUDING SCRAP REWORK AND REPAIR - AN MILP APPROACH Yum, Bong-Jin; MCDOWELL, ED, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.25, no.10, pp.1451 - 1464, 1987-10 | |
ANALYSIS OF THE PREDICTION-PROBLEM WITH ERRORS IN THE VARIABLES YUM, BJ; Yum, Bong-Jin, IIE TRANSACTIONS, v.22, no.1, pp.73 - 83, 1990-03 | |
A HEURISTIC METHOD FOR SOLVING REDUNDANCY OPTIMIZATION PROBLEMS IN COMPLEX-SYSTEMS KIM, JH; Yum, Bong-Jin, IEEE TRANSACTIONS ON RELIABILITY, v.42, no.4, pp.572 - 578, 1993-12 | |
ESTIMATION METHODS FOR THE MEAN OF THE EXPONENTIAL-DISTRIBUTION BASED ON GROUPED AND CENSORED-DATA SEO, SK; Yum, Bong-Jin, IEEE TRANSACTIONS ON RELIABILITY, v.42, no.1, pp.87 - 96, 1993-03 | |
THE OPTIONAL ALLOCATION OF INSPECTION EFFORT IN A CLASS OF NON-SERIAL PRODUCTION SYSTEMS Yum, Bong-Jin; MCDOWELL, ED, AIIE TRANSACTIONS, v.13, no.4, pp.285 - 293, 1981 | |
STATISTICAL CALIBRATION WHEN BOTH MEASUREMENTS ARE SUBJECT TO ERROR - A SIMULATION STUDY Yum, Bong-Jin, COMPUTERS INDUSTRIAL ENGINEERING, v.12, no.1, pp.57 - 65, 1987 | |
DETERMINATION OF THE MOST RELIABLE PATH OF A PLANAR FLOW NETWORK LEE, DW; Yum, Bong-Jin, RELIABILITY ENGINEERING SYSTEM SAFETY, v.46, no.3, pp.231 - 236, 1994 | |
On Parameter Design of Binary-Input-and-Binary-Output Dynamic Systems Yum, Bong-Jin; Seong-Jun Kim, QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, v.9, no.6, pp.471 - 476, 1993-01 |
Discover