Results 61-70 of 115 (Search time: 0.013 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility Kim, Yeong-Dae; Kim, JU; Lim, SK; Jun, HB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.11, no.1, pp.155 - 164, 1998-02 | |
Search heuristics for resource constrained project scheduling Lee, Jae-Kwan; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.47, no.5, pp.678 - 689, 1996-05 | |
Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems Lee, DH; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.10, pp.2653 - 2668, 1998-10 | |
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter Roh, HK; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.35, pp.2989 - 3003, 1997 | |
A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules Jeong, KC; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.9, pp.2609 - 2626, 1998-09 | |
A systematic procedure for setting parameters in simulated annealing algorithms Park, MW; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.25, no.3, pp.207 - 217, 1998-03 | |
Algorithms for determining capacities of individual buffers in assembly/disassembly systems Jeong, KC; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.33, no.3-4, pp.605 - 608, 1997-12 | |
A due-date-based algorithm for lot-order assignment in a semiconductor wafer fabrication facility Kim, Yeong-Dae; Bang, JY; An, KY; Lim, SK, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.21, pp.209 - 216, 2008-05 | |
A measure of bullwhip effect in supply chains with a mixed autoregressive-moving average demand process Duc, Truong Ton Hien; Luong, Huynh Trung; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.187, no.1, pp.243 - 256, 2008-05 | |
A heuristic algorithm for a production planning problem in an assembly system Park, MW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.2, pp.138 - 147, 1999-02 |
Discover