81 | Modeling the surface swept by a generalized cutter for NC verification Chung, YC; Park, JW; Shin, Hayong; Choi, BK, COMPUTER-AIDED DESIGN, v.30, no.8, pp.587 - 594, 1998-07 |
82 | Classroom Note: On the Expected Number of Tosses Until HTHT Appears Chae, Kyung-Chul, INTERNATIONAL JOURNAL OF MATHEMATICAL EDUCATION IN SCIENCE AND TECHNOLOGY, v.24, no.1, pp.158 - 161, 1993-01 |
83 | Development of Computer System for the Lot-sizing and Scheduling of the Side Frame Press Shop 황학; 차춘남; 선지웅; 한규헌; 문성우; 이석; 홍성표, 산업공학(IE INTERFACES), v.9, no.2, pp.3 - 17, 1996-07 |
84 | A Semantic Network Approach to PPO (Products, Processes, Organizations/Resources) Modeling for PDM Systems 서효원; 이희정; 하승철, 한국CAD/CAM학회 논문집, v.4, no.3, pp.238 - 246, 1999-09 |
85 | Development process of nuclear power industry in a developing country: Korean experience and implications Sung, Chang Sup; Hong, SK, TECHNOVATION, v.19, no.5, pp.305 - 316, 1999-05 |
86 | Representing and Processing Parametric Knowledge in Abstract Simulation 윤완철, 대한산업공학회지, v.0, no.0, pp.149 - 149, 1992 |
87 | A New Description Scheme and a Computer Support for the Analysis of Human Errors in Nuclear Power Plants 윤완철; 이용희; 김영수, 대한산업공학회지, v.0, no.0, pp.0 - 0, 1993 |
88 | ACCELERATED LIFE TEST PLANS UNDER INTERMITTENT INSPECTION AND TYPE-I CENSORING - THE CASE OF WEIBULL FAILURE DISTRIBUTION SEO, SK; Yum, Bong-Jin, NAVAL RESEARCH LOGISTICS, v.38, no.1, pp.1 - 22, 1991-02 |
89 | RESOLUTION OF MULTIPLE CONFLICTS IN THE PETRI-NET MODEL OF FAS SON, SK; Choi, Byoung Kyu; PARK, TU; Lee, Kwang-Hyung, INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.4, no.4, pp.253 - 262, 1991 |
90 | 작업스케쥴링 문제해결을 위한 Branch and Bound 해법의 비교분석(Heuristic Aspects of the Branch and Bound Procedure For a Job Scheduling Problem) 고석주; 이채영, 대한산업공학회지, v.18, no.2, pp.141 - 147, 1992 |