Results 1-10 of 32 (Search time: 0.006 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
AN ALGORITHM FOR CONFIGURING EMBEDDED NETWORKS IN RECONFIGURABLE TELECOMMUNICATION NETWORKS Sung, Chang Sup; Park, Sung Ki, TELECOMMUNICATION SYSTEMS, v.4, no.3-4, pp.241 - 271, 1995 | |
Minimax Approach for Logical Configuration in Reconfigurable Virtual Circuit Data Network Sung, Chang Sup; park, s.k., IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, v.E78A, no.8, pp.1029 - 1033, 1995-08 | |
LOCATING AN OBNOXIOUS FACILITY ON A EUCLIDEAN NETWORK TO MINIMIZE NEIGHBORHOOD DAMAGE Sung, Chang Sup; cheol min joo, NETWORKS, v.24, no.1, pp.1 - 9, 1994 | |
Scheduling of Products with Common and Product-Dependent ComponentsManufactured at a Single Facility Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.8, pp.773 - 784, 1993-01 | |
Determination of Automated Storage/Retrieval System Size Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.19, no.4, pp.269 - 286, 1992-01 | |
Configuring Both Backbone and Logical Networks for a Reconfigurable Network with Link Failures Allowed Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.26, no.0, pp.227 - 249, 1996-04 | |
Development process of nuclear power industry in a developing country: Korean experience and implications Sung, Chang Sup; Hong, SK, TECHNOVATION, v.19, no.5, pp.305 - 316, 1999-05 | |
Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed Sung, Chang Sup; Yoon, SH, ENGINEERING OPTIMIZATION, v.28, no.3, pp.231 - 243, 1997-04 | |
Performance Analysis of a Queueing System with Facilities Requiring Post-Processing Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.19, no.8, pp.767 - 781, 1992-01 | |
A Single Machine Scheduling Problem with Earliness/Tardiness and /starting Time Penalties under a Common Due Date Sung, Chang Sup; u. g. joo, COMPUTERS & OPERATIONS RESEARCH, v.19, no.8, pp.757 - 766, 1992-01 |
Discover