Results 21-30 of 43 (Search time: 0.005 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
A measure of bullwhip effect in supply chains with a mixed autoregressive-moving average demand process Duc, Truong Ton Hien; Luong, Huynh Trung; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.187, no.1, pp.243 - 256, 2008-05 | |
A Lagrangian relaxation approach to multi-period inventory/distribution planning Kim, JU; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.51, no.3, pp.364 - 370, 2000-03 | |
Heuristics for selecting machines and determining buffer capacities in assembly systems Jeong, KC; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.38, no.3, pp.341 - 360, 2000-10 | |
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints Park, MW; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.123, no.3, pp.504 - 518, 2000-06 | |
Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility Kim, Yeong-Dae; Shim, SO; Choi, B; Hwang, Hark, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.16, pp.290 - 298, 2003-05 | |
Heuristic algorithms for a multi-period multi-stop transportation planning problem Kim, JU; Kim, Yeong-Dae; Shim, SO, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.53, no.9, pp.1027 - 1037, 2002-09 | |
Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems Kim, Yeong-Dae; Lee, DH; Yoon, CM, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.133, no.3, pp.624 - 634, 2001-09 | |
Tool requirements planning in a flexible manufacturing system with an automatic tool transporter Kim, Yeong-Dae; Lee, GC; Choi, SK; Lim, SK, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.6, pp.795 - 804, 2001-12 | |
Layout planning for facilities with fixed shapes and input and output points Kim, JG; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.38, no.18, pp.4635 - 4653, 2000-12 | |
Bottleneck-focused scheduling for a hybrid flowshop Lee, GC; Kim, Yeong-Dae; Choi, SW, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.165 - 181, 2004-01 |
Discover