Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 1-3 of 3 (Search time: 0.004 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
1
Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates

Kim, Yeong-Dae; Kim, JG; Kim, HU, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.5, pp.589 - 598, 2001-10

2
A due-date-based algorithm for lot-order assignment in a semiconductor wafer fabrication facility

Kim, Yeong-Dae; Bang, JY; An, KY; Lim, SK, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.21, pp.209 - 216, 2008-05

3
Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility

Kim, Yeong-Dae; Shim, SO; Choi, B; Hwang, Hark, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.16, pp.290 - 298, 2003-05

rss_1.0 rss_2.0 atom_1.0