Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 1-5 of 5 (Search time: 0.011 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
1
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint

Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02

2
HEURISTIC ALGORITHM FOR A MILITARY TRAINING TIMETABLING PROBLEM

Lee, S.Y.; Kim, Yeong-Dae; Lee, H.J., ASIA PACIFIC MANAGEMENT REVIEW, v.14, no.3, pp.289 - 299, 2009-09

3
Linear programming and Lagrangian relaxation heuristics for designing a material flow network on a block layout

Lee, Mi Lim; Kim, Jae-Gon; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.47, no.18, pp.5185 - 5202, 2009

4
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints

Joo, Byung Jun; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.60, pp.572 - 582, 2009-04

5
Minimizing total tardiness on a two-machine re-entrant flowshop

Choi, Seong-Woo; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.199, no.2, pp.375 - 384, 2009-12

rss_1.0 rss_2.0 atom_1.0