Results 1-4 of 4 (Search time: 0.003 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07 | |
A due-date-based algorithm for lot-order assignment in a semiconductor wafer fabrication facility Kim, Yeong-Dae; Bang, JY; An, KY; Lim, SK, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.21, pp.209 - 216, 2008-05 | |
A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property Shim, Sang-Oh; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.3, pp.863 - 875, 2008-03 | |
Minimizing makespan on an m-machine re-entrant flowshop Choi, Seong-Woo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.5, pp.1684 - 1696, 2008-05 |
Discover