Results 1-1 of 1 (Search time: 0.002 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
A due-date-based algorithm for lot-order assignment in a semiconductor wafer fabrication facility Kim, Yeong-Dae; Bang, JY; An, KY; Lim, SK, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.21, pp.209 - 216, 2008-05 |
Discover