Results 41-49 of 49 (Search time: 0.006 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities Kim, Yeong-Dae; Lee, DH; Kim, JU; Roh, HK, JOURNAL OF MANUFACTURING SYSTEMS, v.17, no.2, pp.107 - 117, 1998 | |
Efficient solution procedure and reduced size formulations for p-hub location problems Sohn, J; Park, Sungsoo, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.108, no.1, pp.118 - 126, 1998-07 | |
A parametric power control with fast convergence in cellular radio systems Lee, Chae Young; Park, T, IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, v.47, no.2, pp.440 - 449, 1998-05 | |
Optimal operation grouping and sequencing technique for multistage machining systems Kim, IT; Suh, Hyo-Won, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.8, pp.2061 - 2081, 1998-08 | |
Forward link power control for CDMA cellular systems Kim, D; Kim, Sehun, IEICE TRANSACTIONS ON COMMUNICATIONS, v.E81B, no.6, pp.1224 - 1230, 1998-06 | |
Production Switching Mechanism for an Unreliable Two-Stage Production Line 고시근; 황학, J. OF THE KOREAN INSTITUTE OF INDUSTRIAL ENGINEERS, v.24, no.1, pp.105 - 113, 1998-01 | |
Development of dispatching rules for automated guided vehicle systems Hwang, Hark, JOURNAL OF MANUFACTURING SYSTEMS, v.17, no.2, pp.137 - 143, 1998 | |
Evaluating the Base Complexity of Planning Required in User Interface 이동석; 윤완철; 최상섭, 대한산업공학회/한국경영과학회 98 학술대회, pp.1 - 4, 1998 | |
Expected service time model for a rotary parking system Hwang, Hark; Lee, S, COMPUTERS & INDUSTRIAL ENGINEERING, v.35, no.3-4, pp.559 - 562, 1998-12 |
Discover