Results 1-3 of 3 (Search time: 0.003 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Minimizing Total Weighted Completion Time at a Pre-assembly Stage Composed of Tow Feeding Machines Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.54, no.3, pp.247 - 255, 1998-04 | |
Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility Kim, Yeong-Dae; Kim, JU; Lim, SK; Jun, HB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.11, no.1, pp.155 - 164, 1998-02 | |
Petri net modeling and scheduling for cyclic job shops with blocking Song, JS; Lee, Tae-Eog, COMPUTERS & INDUSTRIAL ENGINEERING, v.34, no.2, pp.281 - 295, 1998-04 |
Discover