Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 1-3 of 3 (Search time: 0.007 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
1
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net

Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07

2
Scheduling single-armed cluster tools with reentrant wafer flows

Lee, HY; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.19, no.2, pp.226 - 240, 2006-05

3
An extended event graph with negative places and tokens for time window constraints

Lee, Tae-Eog; Park, SH, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.2, no.4, pp.319 - 332, 2005-10

rss_1.0 rss_2.0 atom_1.0