Results 1-4 of 4 (Search time: 0.003 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04 | |
Characterizing Token Delays of Timed Event Graphs for K-Cyclic Schedules Lee, Tae-Eog; Kim, Hyunjung; Roh, Dong-Hyun; Sreenivas, Ramavarapu S., IEEE TRANSACTIONS ON AUTOMATIC CONTROL, v.62, no.2, pp.961 - 966, 2017-02 | |
Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04 | |
Scheduling Lot Switching Operations for Cluster Tools Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11 |
Discover